Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 LAccepted-Finance | L1 | Accepted-Finance Highest bidder | |
| 2 | L2₹39.6 L+₹13,556.97 (0.34%)Accepted-Finance | L2 | Accepted-Finance Lowest bidder | |
| 3 | L3₹39.7 L+₹27,114.74 (0.69%)Rejected-Finance | L3 | Rejected-Finance Lowest bidder |
Tender Value
₹39.9 L
EMD Value
₹4.0 L
Closing Date
6 Mar 2026, 2:00 pmClosed
EO
Nagar Panchayat Jhalu
Work of TPD Wet Waste Processing Pit Composting in Nagar Panchayat Jhalu District Bijnor.
2026_DOLBU_1119676_6
06/E-Tender/2025-26
Open Tender
Civil Works
Percentage
90 days
Nagar Panchayat Jhalu
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
EO
₹4.0 L
21 Mar 2026
25 Feb 2026
6 Mar 2026
25 Feb 2026
6 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Wet Waste Processing Unit for 5 Tons | |||||
| 1.01 | Surface Dressing of ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil. | - | Sqm | - | - |
| 1.02 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge 2.1.1. All kinds of soil. | - | Cum | - | - |
| 1.03 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5KM also including ramming and watering of the earth in layers not exceeding 20cm in trenches, plinth, sides of foundation etc. complete | 1 | cum. | - | - |
| 1.04 | Providing & Laying of C.C. in 1:6:12 with c/s and 40 mm G.S.B. in foundation of Floor i/c all labour ,materials and T&P etc. | 1 | Cum. | - | - |
| 1.05 | R.C.C. work in column 1:2:4 with cement , coarse sand, 20 mm gauge stone grit I/c all complete | - | Cum. | - | - |
| 1.06 | M150 Brick Work in 1:6 c/s mortar in sub-structure i/c all labour & T&P etc. | 1 | Cum. | - | - |
| 1.07 | 12 mm thk Internal Plaster in 1:3 with c/s mortar in wall i/c all materials, labour & T&P etc. S.I-586 | - | Sqm. | - | - |
| 1.08 | M.S.Iron work in plain work such as R.C.C. Work I/c all complete | - | s | - | - |
| 1.09 | Providing & laying steelbars including cutting binding, placing and complete in all respect | - | Qtl | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.93 MB
BOQ_2082713.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .