Tender Value
₹1.1 L
EMD Value
₹1,050
Closing Date
5 May 2022, 12:00 pmClosed
S.E. E D C- MVVNL,Unnao
S.E.E Distribution Circle Unnao
Increasing capacity of different Distribution Transformers in the area of E.D.D I, II IV Bangarmau under E.D.C UNNAO against Package EDCU/Grishm Kalin Yojana 2022-23
2022_MVVNL_691369_2
07/E.D.C./Unnao/2022-23
Open Tender
Miscellaneous Works
Fixed-rate
180 days
UNNAO
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
A/C-No.3355002101008374,IFSC-Code-PUNB0335500,
₹1,050
9 May 2022
2 May 2022
6 May 2022
2 May 2022
5 May 2022
2 May 2022
Amount
Safe carriage, loading and unloading of following material from ESC Daliganj, Lucknow to work site/J.E. dump store.
11/0.4 K.V. 25 K.V.A. Transformer.
11/0.4 K.V. 63 K.V.A. Transformer.
11/0.4 K.V. 100 K.V.A. Transformer.
11/0.4 K.V. 250 /400 K.V.A. Transformer.
11 K.V. PCC Pole 8.5 Mtr. Long.
ACSR Weasel conductor.
11 K.V. Pin Insulator
M.S. Top Channel 125X65X2240 mm.
Top Dropper Channel 100X50X2028 mm.
M.S. Angle 75X75X2028 with clamps & Nut & bolts
Holding clamp for Top & Droper channnel with Nuts & Bolts
AB Conductor (3x50+1x35+1x16) Sq.mm.
LT Clamp with nut & Bolt
Earthing complete.
Stay Complete
LT Shackle Insulator
Nut & Bolt for shackle
Erection of PCC single pole Long including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site.
Erection of PCC double pole Long including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site.
Disconnection of existing Transformer from system shifted upto safe place to the nearest 33/11 K.V. Sub-Station of Division or required place.
Placing of 25/63/100/250 K.V.A. healthy Transformer from out side of yard to plinth with the help of crain and T & P.
Earthing of pole as per REPO Norms
Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials
Layng stringing and sagging following type HT/LT lines including all associated work with jint/jumpers and binding of insulator as required
11 KV line three phase
LT Line by ABC single/Three phase
Mounting of Following t/F on single/double polw including its cartage and dragging from dump site to pit site.
T/F 10 /16 /25/63 /250 KVA
Supply and fixing of following material -
Aluminium Lug 400 mm.
Note :- 1 All the material provided by contractor shall be as per norms of UPPCL/RESPO. 2 One carriage including loading/unloading from dump site to pit site is included in scope of work 3 During execution of work all risk will be of the contractor. 4 Contractor will provide all T & P, vehicle and man power. 5 All the old and used material should be taken on book. 6 The quantity may be vary ±10%.
Katyani Construction Co.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .