Tender Value
₹50.5 L
EMD Value
₹1.0 L
Closing Date
27 Oct 2022, 3:00 pmClosed
EE, CD-III, APWD, P/PUR
O/o EE, CD-III, APWD, P/PUR
Construction of CC drain , CC toe wall cum drain and culvert wherever necessary on the road side from ATR to Lall Pahad Road.(BalanceWork).Construction of Toe wall for a length of 90.00mtr, Toe wall cum drain
2022_APWD_7550_1
NIT No.07/EE/CD-III/2021-22
Open Tender
Civil Works - Others
Works
180 days
Lall Pahad
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.0 L
Yes
28 Oct 2022
10 Oct 2022
28 Oct 2022
11 Oct 2022
27 Oct 2022
11 Oct 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources)
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Providing and fixing weep holes with 50mm dia PVC pipe.
Supplying and filling stone boulders as filter media.
P VENKET RAMAN
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .