Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance MEERA ENCLAVE 1ST FLOOR RAJGARH ROAD GUWAHATI | GUWAHATI | KAMRUP METRO | ASSAM | 781003 | Admitted-Finance |
| 3 | Admitted-Finance 1 1 MARIANI ROAD RAJABARI NEAR ITI COLLEGE JORHAT ASSAM 785014 | JORHAT | ASSAM | 785014 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
17 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
T S GANESH KUMAR
T S GANESH KUMAR 9108985985
PILING WORKS FOR NUMALIGARH REFINERY
2020_NRL_606422_1
TPFMC/CONS/NRL/082176C/008
Open Tender
Civil Works
Works
150 days
NUMALIGARH REFINERY
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
23 Mar 2021
19 Jan 2021
18 Feb 2021
19 Jan 2021
17 Feb 2021
4 Feb 2021
120 days
Amount
All Supply, Fabrication, Erection, Construction works shall be performed as per AFC Drawings, Project Specifications, Project Standards, General Notes, Indian Codes, etc.,
Grubbing, scrubbing & clearing the areas, removal of roots / boulders, breaking clods, making up the hollow produced by removal of roots / boulders with available earth, clearing the site of all objectionable / unserviceable materials by means of manual or mechanical excavation as per directions of Engineer-in-Charge. Including loading, transport, unloading and disposal of the unserviceable material at designated areas within the plant boundary and leveling the same.
Execution of pile bore by rotary and/or percussion means in any soil , by approved technique through all types of sub soil strata, making undereaming bulb, including the use of bentonite mud if required, supply of Ready Mix Concrete, casting and vibration of concrete of any grade as per the design mix, including concrete quality control tests as per Approved QCP, supplying admixtures and other materials including plasticizers if required as per specification TP-1ZZZA-CV-SPE-0037 for BCIS piling/NR-0ZZZZ-CV-SPE-0002 Specification for Concrete Works/recommendations, excluding the cost of steel reinforcement but including the cost of boring with casing and/or bentonite solution (include any additive or admixture if necessry to avoid soil cave-ins) for maintaining borehole side, tremie concreting, supply of necessary materials , machineries and labours and carrying out all ancillary works, disposal of surplus materials including earth/muck for all leads and lifts within refinery premises, shifting of plant and equipment from one pile location to other, all complete as per drawing and direction of Engineer-in-charge. issue of driving records shall be in the scope of sub-contractor without any additional charge. Mobilising and Demobilising of Equipment / Tools and Tackles as required for executing the Piling work and / or shifting the Equipment from one location to another as required and as directed by Engineer-In-charge. The quoted rate shall also include mateial Inspection and testing. Rate including the material filled above cut-off level Rate includes all ancillary equipments, materials, tools, tackles , laboiur etc. all complete necessary to install Bored cast-in-situ R.C.C. under ream piles at site, as per Technical specification and demobilization of the same after completion of job.Quoted Rate shall also include Contractor's preparedeness plan and mitigation measures for working during the monsoon period. The bore hole above the pile cutoff level shall be finished with same concrete of height variable according to construction sequence (minimum 600mm) and balance height by sand or crushed stone as per typical detail shown in the drawing TP-1U51A-CV-PLD-0001 sht 3/4. Pile Measurement: Length of each pile x No of Piles. Length of each pile shall be measured from Pile Cutt Off Level as per actual driving records or as per IFC Drawings (boring / concreting/ filling above the cutt off level till working Level shall not be considered). Cut Off Level shall be as per the IFC Drawings. This length and volume inlcudes single under reamed bulb of dia as per drawings for each pile. ( preparation and concreting of under reamed bulb and the concrete/ sand/ crushed stone dust provided above the cut-off level, shall not be measured and paid extra)
Same as 3.0 but Pile dia 400mm Bored cast In Situ Under-reamed with 1000mm dia Single bulb, Grade of Concrete M30 with Ordinary Portland Cement of Grade-53 (with minimum cement content of 400 kg/cu.m) and using coarse aggregates of 20 mm and down size as per Drawings and specifications
Supplying and mixing of approved brand of BI-POLAR CONCRETE PENETRATING CORROSION INHIBITING ADMIXTURE ( MASTERLIFE CI 220 or equivalent) in concrete as per manufacturer's specification for protection of reinforcement against corrosion. Supply of admixture and Testing as per ASTM/ IS codes in Contractor's scope.
REINFORCEMENT CAGE FOR CAST-IN-PLACE CONCRETE PILES Supplying and placing in position high strength deformed bar reinforcement cage of specified grade conforming to IS: 1786 for RCC Cast-in-Situ piles for full length of pile,underreamed bulb, including straightening, cleaning, uncoiling, cutting, bending to required shape & lengths as per details, binding with sub-contractor's own 18 SWG black soft annealed binding wire, supplying and placing with proper cover blocks, supports, chairs, spacers, welding, if required, to form a rigid cage; returning of unused / scrap/ unserviceable steel to storage point for all heights and depths etc., all complete including supplying as per instructions of the Engineer-in-Charge. all the rebars to be protected, by the piling contractor, by polyethylene sleeves against the water/soil. Included : Inspection and test of materials Measurement: Weight calculated as the unit weight multiplied by the finished net bar length as per IFC drawings. Scrap and construction materials such as joints, spacers, overlapping and supporting rods not indicated shall not be considered in the measurement.
Same as 4.0 but Steel Grade Fe 500D CRS - coating or protection of Rebars included
LOADING TEST (COMPRESSION) Conducting Vertical Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory work, finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc., removal of load along with all preparatory work and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE : Cost of Pile required to be driven for conducting Pile Tests to be included in Item Nos 3.0, 3.1, 3.2, 4.0, 4.1
Same as 5.0 but Loading test on working pile - 400mm dia single bulb underreamed pile
Same as 5.0 but Loading test on Initial test pile- 400mm dia single bulb underreamed pile
LOADING TEST (TENSILE TEST OR UPLIFT) Conducting Pull Out Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory work, finishing pile head by breaking off the concrete above the cutoff level , supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE: Cost of Pile required to be driven for conducting Pile Tests to be included in Item Nos 3.0, 3.1, 3.2, 4.0, 4.1 Measurement : Number of test
Same as 6.0 but Loading test on working pile - 400mm dia single bulb underreamed pile
Same as 6.0 but Loading test on Initial test pile - 400mm dia single bulb underreamed pile
LOADING TEST (HORIZONTAL OR LATERAL LOADING TEST) Conducting Lateral Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory works, pile head preparation by breaking off the concrete above the cutoff level , supply & erection of kentledge of suitable magnitude, labor, excavation, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, note: Cost of Pile required to be driven for conducting Pile Tests to be included in Item Nos 3.0, 3.1, 3.2, 4.0, 4.1 Measurement : Number of test
Same as 7.0 but Loading test on working pile - 400mm dia single bulb underreamed pile
Same as 7.0 but Loading test on Initial test pile- 400mm dia single bulb underreamed pile
INTEGRITY TEST ON WORKING PILE Conducting Integrity test on piles (NDT Test) on working piles of any diameter including necessary excavation and pile chipping, pile head preparation, mobilizing all necessary equipment, technicians, head preparation, setup, interpretation, computation, analysis of results and submission of reports all complete as perproject specifications/ IS code and as directed by Engineer-in-charge Note: Cost of Pile required to be driven for conducting Pile Tests to be included in Item Nos 3.0, 3.1, 3.2, 4.0, 4.1 Measurement : Number of test
Same as 8.0 but Integrity Test - Pile dia 400mm single bulb underreamed pile
EXCAVATION Earth work in excavation for all kind of Soil including all labour, materials, dressing of sides, pumping & bailing out water accumulated due to rain and / or subsoil waters and including disposal or stacking, leveling and neatly dressing as decided by Engineer-in-Charge including providing temporary supports to existing service lines like water pipes, sewerage, electric cables, etc., if any, complete, including shoring/ strutting /sheet pile, all materials and labour complete and as directed by Engineer-in-Charge for following depth. Dewatering system supply, installtion of number of wells, pumps and all associated works complete, maintenance, etc., from Start of excation works till piling works execution and pile testing are completed and as per directions of Engineer-in-Charge. Rate for de-commissioning of dewatering system shall also be considered. Excavated soil shall be disposed at least up to the distance of 500 meter from the plant Boundary for backfilling and the charges for the same is included in this item.
same as 9.0 but from grade level upto 3.0m depth
TRANSPORTATION Transportation of surplus earth/debris to dumping area outside site Carting the surplus excavated earth/rocks and debris from construction area beyond the initial lead of 500 meters to the approved dumping area outside the plant boundary at any distance from the site, including re-excavating the deposited soil excavated earlier, transportation, loading, unloading, laying at all depths/heights, stacking, levelling and dressing both the area (viz. from where the earth is carted and where it is deposited) to required levels and slopes complete with all lifts. Any payment of fee and duties for using the dump. Note : Outing gate of Refinery shall be decided by NRL / EIC as per the site condition
Same as 10.0 with Transportation to any designated area within plant boundaries beyond 500 m
Same as 10.0 with Transportation to any demarked area outside plant boundary, lead upto 2km from the gate of refinery
Same as 10.0 with Transportation to any demarked area outside plant boundary, beyond 2km upto 5km from the gate of refinery.
Same as 10.0 with Transportation to any demarked area outside plant boundary, beyond 5km upto 10 km from the gate of refinery.
North East Engineering n Construction
PUNJAB ENGINEERING COMPANY (PROJECT DIVISION)
KARAN CONSTRUCTION CO
Simplex Infrastructures Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .