Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L-1 | Accepted-AOC Ok |
| 2 | L-2₹2.2 Cr+₹7.4 L (3.47%)Rejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹2.2 Cr+₹7.4 L (3.47%) | L-2 | Rejected-AOC Ok |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
22 Dec 2021, 3:00 pmClosed
PHED No.1, Jhajjar
Jhajjar
SURAKHPUR- Estimate for the Const. of Independent Water Works and providing functional household tap connections and laying of pipeline under the Jal Jeevan Mission Programme in village Surakhpur Tehsil and Distt. Jhajjar
2021_HRY_199249_1
SE JJR No. 9059 dated 03.12.2021 Surakhpur JJM
Open Tender
Civil Works
Works
270 days
Jhajjar
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
Yes
₹4.8 L
Yes
5 May 2022
9 Dec 2021
22 Dec 2021
9 Dec 2021
22 Dec 2021
9 Dec 2021
Amount
SANITARY FITTINGS/WATER METER / Supply of Woltmann type Bulk Water Meter. (Removable mechanism type, Magnetically coupled, having dry dial, hermetically sealed totallser, retrofittable for pulse out put conforming to ISO 4064 Class-B, with flanged and connections.150 MM
SANITARY FITTINGS/WATER METER / Supply of Woltmann type Bulk Water Meter. (Removable mechanism type, Magnetically coupled, having dry dial, hermetically sealed totallser, retrofittable for pulse out put conforming to ISO 4064 Class-B, with flanged and connections.150 MM
Supplying, erection, testing and commissioning of Horizontal motor pumping set for raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP Make: KSB, CRI, Kirlosker, Crompton Greeve, Lubi) 700 LPM 5.00 BHP
Operation & Maintenance Operation & maintenance for the complete scope of work mentioned in the DNIT (Disinfection material will be supplied by the PHED) as per schedule-IV during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. (Will be charged to A/mtc estimate)." Defect liability period (Operation Only)
Operation & maintenance during 1st year
Operation & maintenance during 2nd year
Operation & maintenance during 3rd year
Operation & maintenance during 4th year
Operation & maintenance during 5th year
Bidder Name
Amount
GABBAR SINGH SUHAG(GSTN-NA)
Himmat Singh Contractor(GSTN-NA)
GABBAR SINGH SUHAG
Himmat Singh Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .