Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-Finance | ₹20.5 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹20.7 LRejected-Finance | ₹20.7 L | L2 | Rejected-Finance Highest |
| 3 | L3₹20.9 LRejected-Finance | ₹20.9 L | L3 | Rejected-Finance Highest |
Tender Value
₹20.5 L
EMD Value
₹20,500
Closing Date
10 May 2026, 6:00 pmClosed
Ceo ZP Thane
Ceo office ZP Thane
Special Repairs to pipewater supply scheme ATTembhurli (V.P.- Manjare) Tal. Shahapur Dist. Thane
2026_THANE_1299699_18
E-TENDER NOTICE NO 01/EE/RWSD/ZPTHANE/2026-27 UNEMP
Open Tender
Civil Works
Percentage
30 days
Shahapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹20,500
7 Jul 2026
2 May 2026
11 May 2026
2 May 2026
10 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No.1: Providing ISI mark DI/GI. pipe of following class and dia. including all statutory duties & taxes such as GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. | 900 | Rmt | 805 | ₹7,24,500 |
| 2 | Item No.2: Providing GI Specials 10% Of Item 1 | 1 | Job | 72,450 | ₹72,450 |
| 3 | Item No.3:-Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading
as directed by Engineer-in-charge, normal
dewatering, preparing the bed for
foundation and excluding backfilling, etc.
complete. | 63 | Cum | 232.1 | ₹14,622.3 |
| 4 | Item No.4:-Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as
below, stacking as directed by Engineer-incharge,
normal dewatering, preparing the bed
for foundation and excluding backfilling, etc.
complete. | 63 | Cum | 691.9 | ₹43,589.7 |
| 5 | Item No.5: Excavation for foundation / pipe trenches in hard rock and concrete road by
chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259 | 472.5 | Cum | 1,230.9 | ₹5,81,600.25 |
| 6 | Item No.5: Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour etc. complete either underground or in vertical position, as directed by Engineer-in-charge.
80mm GI | 900 | Rmt | 170.5 | ₹1,53,450 |
| 7 | Item No.6: Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental
store, unloading, stacking excluding GST levied by GOI & GOM in all
80 MM Dia | 5 | Nos | 6,158 | ₹30,790 |
| 8 | Item No.7:- Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc.
complete.(Ratefor all class of valves.)
80mm Dia | 5 | Nos | 2,141.7 | ₹10,708.5 |
| 9 | Item No.8:- Valve Chamber with Precast RCC Covers Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation ,B.B .masonry in CM1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge.
60x45x90 | 5 | Nos | 8,124.6 | ₹40,623 |
| 10 | Item No.9: Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction etc.complete. | 94.5 | Cum | 101.2 | ₹9,563.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_2231915.xls
BOQ • 0.25 MB
nit1UNEMPmerged.pdf
Tender Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].