| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.5 CrAdmitted-Finance | -22.01% | ₹13.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹15.0 CrAdmitted-Finance B 1005 LOKMAT BHAVAN WARDHA ROAD NAGPUR 12 | -13.60% | ₹15.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹15.4 CrAdmitted-Finance 202 2ND FLOOR AGGARWAL SHOPPING CENTRE PLOT NO 1 LSC CD BLOCK PITAMPURA NEW DELHI 110034 | NORTH WEST | DELHI | 110034 | -11.00% | ₹15.4 Cr | L3 | Admitted-Finance |
| 4 | L4₹15.9 CrAdmitted-Finance 1148 E SYKES EXTENSION KOLHAPUR 416001 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416001 | -8.20% | ₹15.9 Cr | L4 | Admitted-Finance |
| 5 | L5₹17.2 CrAdmitted-Finance 501 SHRIKRISHNA RESIDENCY KHARE TOWN DHARAMPETH NAGPUR 440010 | NAGPUR | NAGPUR | MAHARASHTRA | 440010 | -1.00% | ₹17.2 Cr | L5 | Admitted-Finance |
Tender Value
₹17.4 Cr
EMD Value
₹8.7 L
Closing Date
27 Mar 2026, 5:00 pmClosed
Office of the EEDPDC NMC Nagpur
Office of the EEDPDC NMC Nagpur
Proposed Construction Work of Swimming Pool Timki Hansapuri . Tahsil and Dist Nagpur, Maharashtra.
2026_NMCN_1288863_1
1/26/EEDPDC/2026
Open Tender
Civil Works
720 days
Office of the EE DPDC NMC Nagpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
₹8.7 L
Office of the Chief Engineer 5th floor Civil line
30 Jun 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Proposed Construction Work of Swimming Pool Timki Hansapuri, Tahsil & Dist- Nagpur, Maharashtra. | |||||
| 1.01 | Dismantling brick masonry in lime or cement mortar and stacking the materils as
directed with all leads, lifts etc. | - | One Cubic Metre | - | - |
| 1.02 | Dismantling stone masonry in lime or cement mortar including stacking the
materils as directed with all leads, lifts etc. | - | One Cubic Metre | - | - |
| 1.03 | Removing lime or lean cement concrete including stacking the spoils as directed
with all leads, lifts etc, complete. | - | One Cubic Metre | - | - |
| 1.04 | Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete | - | Number | - | - |
| 1.05 | Removing doors and windows with frames and stacking the materials as directed
with all leads, lifts etc. complete. | - | Number | - | - |
| 1.06 | Removing rich mix cement concrete including stacking the spoils as directed with all
leads, lifts etc, complete. | 1 | One Cubic Metre | - | - |
| 1.07 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Ground Floor | - | One Cubic Metre | - | - |
| 1.08 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Manual Means Ground Floor | - | One Cubic Metre | - | - |
| 1.09 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means Ground Floor | - | One Cubic Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.