| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.4 LAccepted-AOC 104 JASH APARTMENT NEAR LAXMI NARYAN MANDIR MAHIM ROAD PALGHAR TAL PALGHAR DIST THANE 401404 | PALGHAR | THANE | MAHARASHTRA | 401404 | ₹47.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹48.1 LRejected-Finance GHARKUL CO OP HSG SOCIETY PLOT NO RH 125 MIDC RESI ZONE KALYAN ROAD DOMBIVLI E 421203 | THANE | MAHARASHTRA | 421203 | ₹48.1 L | L2 | Rejected-Finance Not L1 |
| 3 | L3₹51.4 LRejected-Finance PLOT NO 45 GUT NO 140 VIVEKANANDA NAGAR NEAR CIDCO WATER TANK NAGAR I CIDCO WALUJ MAHANAGAR 431133 | AURANGABAD | AURANGABAD | MAHARASHTRA | 431133 | ₹51.4 L | L3 | Rejected-Finance Not L1 |
| 4 | L4₹52.5 LRejected-Finance 2 105 A THELAPUR ARUNODAY APARTMENT NL 6 7 2 SEC 8 PHASE 2 NERUL WEST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | ₹52.5 L | L4 | Rejected-Finance Not L1 |
| 5 | L5₹54.8 LRejected-Finance | ₹54.8 L | L5 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | M/S. Govardhani Construction Co. L5 | M/s B J Samrut L3 | Sai Construction Company L6 | Trimurti Enterprises L7 | S D BUTALA L10 | M/s.R.S.Kolate L2 | Reliance Construction L4 | Orion Infratech Group L9 | AVINASH SAKHARAM PATIL L8 | Aditya Enterprises L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||||||||||
| 1.10Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete. (Lift upto Up to 3.00 m.) (By Mechanical Means) | |||||||||||||
| 2.00 | Excavation for 600mm dia. Pipeline | 235 | Meter Cube | 100 ₹23,500 | 160 ₹37,600 | 150 ₹35,250 | 210 ₹49,350 | 190 ₹44,650 | 50 ₹11,750 Lowest | 184.66 ₹43,395.1 | 150 ₹35,250 | 300 ₹70,500 | 100 ₹23,500 |
| 3.00Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | |||||||||||||
| 4.00 | Excavation for 600mm dia. Pipeline | 47 | Meter Cube | 150 ₹7,050 | 200 ₹9,400 | 600 ₹28,200 | 380 ₹17,860 | 700 ₹32,900 | 500 ₹23,500 | 382.17 ₹17,961.99 | 225 ₹10,575 | 450 ₹21,150 | 100 ₹4,700 Lowest |
| 5.00Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means( Rates excluding GST) | |||||||||||||
| 6.00 | Excavation for 600mm dia. Pipeline | 188 | Meter Cube | 1,000 ₹1,88,000 | 280 ₹52,640 Lowest | 785 ₹1,47,580 | 1,190 ₹2,23,720 | 1,100 ₹2,06,800 | 500 ₹94,000 | 1,165.94 ₹2,19,196.72 | 1,350 ₹2,53,800 | 850 ₹1,59,800 | 800 ₹1,50,400 |
| 7.00 | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. | 117 | Cubic Meter | 600 ₹70,200 | 200 ₹23,400 | 100 ₹11,700 Lowest | 1,225 ₹1,43,325 | 500 ₹58,500 | 500 ₹58,500 | 1,371.6 ₹1,60,477.2 | 800 ₹93,600 | 2,500 ₹2,92,500 | 400 ₹46,800 |
| 8.00Dewatering the excavated trenches and pools of water in the building trenches/ pipeline trenches, well works by using pumps and other devises including disposing of water to safe distance as directed by Engineer-in-charge (Including cost of machinery, labour, fuel) etc. complete | |||||||||||||
| 9.00 | Dewatering work | 1 | Job | 1,25,000 ₹1,25,000 | 5,000 ₹5,000 Lowest | 1,00,000 ₹1,00,000 | 1,84,883.5 ₹1,84,883.5 | 45,000 ₹45,000 | 11,100 ₹11,100 | 3,36,000 ₹3,36,000 | 2,25,000 ₹2,25,000 | 1,50,000 ₹1,50,000 | 50,000 ₹50,000 |
Tender Value
₹61.0 L
EMD Value
₹61,000
Closing Date
21 Apr 2026, 5:00 pmClosed
Superintending Engineer Mumbai
Superintending Engineer Mumbai
DC work Lowering of 600 mm dia.MS TTC main pipeline in front of plot No. D-16-1
2026_MIDC_1292746_1
MIDC/DC work/Tender/2026-27
Open Tender
Civil Works
Item Rate
270 days
TTC Indl Area Mahape
Please refer Tender documents.
2 documents required · 2 mandatory
₹12,980
₹61,000
19 Jun 2026
7 Apr 2026
23 Apr 2026
7 Apr 2026
21 Apr 2026
16 Apr 2026
7 Apr 2026 - 10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.1 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete. (Lift upto Up to 3.00 m.) (By Mechanical Means) | - | - | - | - |
| 2Excavation for 600mm dia. Pipeline | |||||
| 3Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | |||||
| 4Excavation for 600mm dia. Pipeline | |||||
| 5Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means( Rates excluding GST) | |||||
| 6Excavation for 600mm dia. Pipeline | |||||
| 7Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. | |||||
| 8Dewatering the excavated trenches and pools of water in the building trenches/ pipeline trenches, well works by using pumps and other devises including disposing of water to safe distance as directed by Engineer-in-charge (Including cost of machinery, labour, fuel) etc. complete | |||||
| 9Dewatering work | |||||
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.94 MB
TenderDocument.pdf
Tender Documents • 0.35 MB
BOQ_2221848.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].