Repair and maintenanace of 100 KVA Transformer Substation Transformer copper wound) Make Trinity SL No 1094/2 Operating at Arendur Jackwell Supplying Drinking Water To Siddapur Town
DMA/2025-26/WS/WORK_INDENT51164/CALL-2
DMA/2025-26/WS/WORK_INDENT51164/CALL-2
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
DMA Town Panchayat Siddapura
5 documents required · 5 mandatory
Similar Nature of work done Certificate
Eigible Electrical Contractor Licence Copy
Qualification information A and B Format.
GST registration and Clearance Certificate.
Turn Over Certificate Last five year 2020-21 to 2024-25
₹500
₹15,550
5 Feb 2026
29 Jan 2026
7 Feb 2026
4 Feb 2026
Repair and maintenanace of 100 KVA Transformer Substation Transformer copper wound) Make Trinity SL No 1094/2 Operating at Arendur Jackwell Supplying Drinking Water To Siddapur Town
Unloading of the faulty Transformer tank with active parts and accessories at firm's work or loading of repaired Transformer tank with active parts or accessories at firm's works. (As per KPTCL SR 20...
Dismantling faulty Transformer for joint inspection at repairer spremises includingall activities such as opening of top cover de tanking of core and winding separation of HV LV coils conducting relim...
Main Tank of Power Transformers Modification replacement of link board for 110 33 11 kV Transformers Rate given per phase As per KPTCL SR 2023-24 P No140 including transportation work site to work sho...
Drying of Transformer at factory Drying of active parts of transformer in Oven (ii) 110 kV and below class Transformer(As per KPTCL SR 2023-24) P No.141
Reassembly of Core and winding 100 KVA Transformer As per KPTCL SR 2023-24 P No.141
Filling of oil to the main tank and OLTC tank, filtering the oil including filtering tillattainment of prescribed BDV valves including labour, filtering equipment along
with accessories. (As per KPTCL...
a) Testing the Transformer for routine tests
as per IS 2026-1983 if repairs are carried
out at Repairer's work. b) Testing the Transformer for IR values, Voltage ratio at all Taps, Short Circuit Test...
Supervising and Commissioning of Transformer (As per KPTCL SR 2023-24) P No.144
Solid Insulation : Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight (As per KPTCL SR 2023-24) P No.148
Winding: Providing re-insulation to HV/LV
winding whenever necessary for total weight of winding except solid insulation (As per KPTCL SR 2023-24) P No.149
Providing new windings in place of damaged winding includingcost of materials, labour, drying
etc., (Both HV & LV) - per kg of winding (As per KPTCL SR 2023-24) P No.149
Marshalling Box (with IP 55 degree of protection, TBs, Earthing arrangement,mounting arrangements for various components etc.,) (As per KPTCL SR 2023-24) P No.139 SL No.9
For Loading and unloading 10 cum capacity (As per KPTCL SR 2023-24) P No.96 SL No. C VOL-1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
51164.doc
Tender Document • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .