Tender Value
₹1.1 Cr
EMD Value
₹2.6 L
Closing Date
23 Jun 2026, 4:00 pm
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Upgradation of Irrigation Canal Shangdong Skambordo(Under Capex)
2026_PWD_19017_2
12 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
120 days
LEH
please refer to tender document
4 documents required · 4 mandatory
₹3,000
Payable To Executive Engineer InFC division Leh
₹2.6 L
3 Jun 2026
3 Jun 2026
25 Jun 2026
4 Jun 2026
23 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m.
a) All kinds of soil:-45% | 354.64 | Cum | 445.85 | ₹1,58,116.24 | item 01 |
| 2 | b)Ordinary rock:-30% | 236.42 | Cum | 986.46 | ₹2,33,218.87 | item 02 |
| 3 | c)Hard rock (Blasting Prohibited):-25% | 197.02 | Cum | 2,012.46 | ₹3,96,494.87 | item 03 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 236.42 | Cum | 220.4 | ₹52,106.97 | item 04 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 373.47 | Cum | 6,606.08 | ₹24,67,172.7 | item 05 |
| 6 | Dry stone pitching (any thickness) excluding cost of stones.On Horizontal | 113.23 | Cum | 537.71 | ₹60,884.9 | item 06 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.83 | Cum | 9,557.33 | ₹7,932.58 | item 07 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 83.2 | Kg | 109.33 | ₹9,096.26 | item 08 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form
work for :
a) Foundations, footings, bases for columns | 398.28 | Sqm | 306.15 | ₹1,21,933.42 | item 09 |
| 10 | b)Retaining walls, return walls, walls (any thickness) including attached pilasters,
buttresses, plinth and string courses fillets, kerbs and steps etc. | 2,383.4 | Sqm | 635.44 | ₹15,14,507.7 | item 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_45369.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid