Loading…
Loading…
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
2 Sept 2026, 6:00 pm
GE (A) SURATGARH MIL STATION
GE (A) SURATGARH MIL STATION
TERM CONTRACT FOR ARTIFICER WORKS OF OFFRS MD ACCN (MAP-I) AND OTHER BUILDINGS IN THE AOR OF AGE B/R-II UNDER GE (A) SURATGARH AT SURATGARH MIL STN
2026_MES_765972_2
GE(A)/SOG-TOKEN-12/2026-27
Open Tender
Civil Works
Percentage
365 days
IN THE AOR OF GE (A) SURATGARH
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE(A) SURATGARH
₹40,000
Yes
19 Aug 2026
19 Aug 2026
4 Sept 2026
19 Aug 2026
2 Sept 2026
26 Aug 2026
19 Aug 2026 - 26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | To perform Term Contract services and execute such works upon the items and condition contained or referred to in the aforesaid documents and upon the conditions here-in-after contained as may be demanded and as are enumerated in the aforesaid MES Schedule of rates 2009 Part-I (Specifications) together with amendments Nos 1 to 3 and SSR Part-II 2020 (Rates) together with amendments Nos 1 to 122 including Section 30-Runway and Pavement and General Conditions of Contracts (IAFW-2249) together with errata 1 to 20 and amendments No 1 to 49 forming part of tender documents at the rates contained in the aforesaid MES Schedule during the period of one year from the date of Acceptance of tender.
Note :- (i) The Contractor may fill the %age intended to quote over SSR rates by selecting the option excess (+) or less (-) to quote the percentage above / below the SSR.
(ii) If Schedule rates are offered At Par with MES Schedule ‘0’ should be inserted in percentage box.
(iii) The Less/Excess percentage inserted by the contractor here-in-below shall be deemed firm irrespective of calculations/amount generated elsewhere in this BOQ template. Contractor shall be allowed to insert the percentage only upto two decimal places.
(iv) Main Items and fixtures, base materials shall be from the same manufacturer. (v) List of three top makes specified for various items executed under the subject TC is listed under the Appx 'A' attached to the tender document, these THREE TOP MAKES shall be given preference before incorporating makes listed in the general list of makes in Appendix 'A1' for all applicable items.
(vi) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder. (vii) All old Serviceable/Unserviceable items retrieved from the above is deposited to Concerned Engineer-in-charge store and cost of same deemed to be included in above quoted rate | - | Nos | 20,00,000 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
T12.pdf
Tender Documents • 1.40 MB
BOQ_879845.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].