Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-AOC AT ALIBAG TAL ALIBAG DIST RAIGAD | ALIBAG | RAIGAD | MAHARASHTRA | ₹18.2 L | L1 | Accepted-AOC accepted |
| 2 | L2₹19.8 LRejected-AOC AT POST METKARNI TALUKA MHASALA DIST RAIGAD | MHASALA | RAIGAD | MAHARASHTRA | ₹19.8 L | L2 | Rejected-AOC rejected |
| 3 | L3₹20.4 LRejected-AOC | ₹20.4 L | L3 | Rejected-AOC rejected |
| 4 | L4₹20.6 LRejected-AOC AT RAJAPE POST AMBIVALI TAL KARJAT DIST RAIGAD | KARJAT | RAIGAD | MAHARASHTRA | ₹20.6 L | L4 | Rejected-AOC rejected |
Tender Value
₹20.0 L
EMD Value
₹20,000
Closing Date
17 Mar 2026, 5:00 pmClosed
Executive Engineer Zilla Parishad Raigad Alibag
Shivtirtha Building Zilla Parishad Raigad Alibag
Construction of STBT Road MDR to Vavepanchatan Devkhol Marg, VR 12, Tal. Shrivardhan, Dist. Raigad
2026_RAIGA_1286032_1
ZP-RAIGAD-WORKDIV-176-2025-26
Open Tender
Civil Works
270 days
Tal- Shiwardhan, Dist-Raigad
RZP Registration Contractor AS PER TENDER(OPEN)
12 documents required · 12 mandatory
₹590
₹20,000
27 May 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate)
Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of specified grade @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of bitumen 0f specified grade at the rate of 0.30 Kg Sqm.(on existing bitumen surface.)
Spreading hard murum for side width etc. complete
Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete.
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates)
Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates)
Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates)
Providing and fixing 90 cm x 60 cm Marble plate engraving 10 cm.height letter, figures including painting the lefters/figures withapproved colour and shade complete
Aggregate Sieve Analysis
Elongation and Flakiness Index
Bitumen Penetration,Softening point,Flash & fire point,Specific Gravity
Viscosity
Reimburcement of Royalty Charges if Contractor Produces Original Transport Passes, Supplied by revenue Department. Rubble/Other
Add For GST 18%
Add for Work Insurance 0.5%
Add for SQM Charges 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.09 MB
BOQ_2211492.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid