| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 CrAccepted-Finance GRAM POST MAWANA KHURD MAWANA MEERUT | MEERUT | UTTAR PRADESH | 245206 | ₹7.8 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹8.1 CrRejected-Finance D 172 SAKET MEERUT DISTRICT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹8.1 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹9.0 CrRejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹9.0 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹9.8 CrRejected-Finance GRAM MAJHARA MAHADEVA TARKHANJ DISTRICT GONDA UTTAR PRADESH | TARKHANJ | GONDA | UTTAR PRADESH | ₹9.8 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹9.8 CrRejected-Finance MOH PADAW NAWABGANJ GONDA U P 271303 | GONDA | UTTAR PRADESH | 271303 | ₹9.8 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | amit kumar contractor L1 | Preeti Buildcon Private Limited L2 | M/S CHAUDHARY ASSOCIATES L6 | SHIV CONSTRUCTION L5 | RCC DEVELOPERS PRIVATE LIMITED L7 | S F INFRA PROJECTS L3 | SUMIT SINGH L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Bored cast-in-situ M35 grade R.C.C. pile excluding Reinforcement complete as per Drawaing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000m. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. | 5,095 | RM | 9,000 ₹4.6 Cr | 9,144.64 ₹4.7 Cr | 12,500 ₹6.4 Cr | 8,520 ₹4.3 Cr | 13,000 ₹6.6 Cr | 9,900 ₹5.0 Cr | 8,500 ₹4.3 Cr |
| 2.00 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. | 319 | MT | 45,000 ₹1.4 Cr | 54,983.46 ₹1.8 Cr | 77,000 ₹2.5 Cr | 98,000 ₹3.1 Cr | 80,000 ₹2.6 Cr | 66,000 ₹2.1 Cr | 98,000 ₹3.1 Cr |
| 3.00 | Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. (660) but for each coat of water proof cement paint after the first two coat to give an even shade. (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) Item no 660+ 661. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. | 9,674 | Sqm | 60 ₹5.8 L | 68.06 ₹6.6 L | 83 ₹8.0 L | 260 ₹25.2 L | 100 ₹9.7 L | 80 ₹7.7 L | 250 ₹24.2 L |
| 4.00 | Providing and laying of boulder apron laid in wire crates made with 4mm dia GI Wire Conforming to IS 280 & IS 4826 in 100mmx 100 mm mesh (weaved diagonally) including 10 percent extra for laps and joints laid with stone bouldres weighing not less than 40 kg each. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. | 4,466 | cum | 3,800 ₹1.7 Cr | 3,544.04 ₹1.6 Cr | 4,500 ₹2.0 Cr | 4,750 ₹2.1 Cr | 5,000 ₹2.2 Cr | 4,000 ₹1.8 Cr | 4,750 ₹2.1 Cr |
Tender Value
₹9.8 Cr
EMD Value
₹19.7 L
Closing Date
25 Mar 2026, 2:00 pmClosed
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
Construction work of RCC Pillars to be installed on the Uttar Pradesh and Haryana State Border in Baghpat District in the Financial year 2025-26.
2026_CEMRT_1127675_1
2076/11Cashier-MC PD Baghpat Dt 15-04-25
Open Tender
Civil Works
365 days
EE PD PWD BAGHPAT
CLASS A
3 documents required · 3 mandatory
₹2,714
₹19.7 L
SE MEERUT CIRCLE PWD MEERUT
4 May 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Bored cast-in-situ M35 grade R.C.C. pile excluding Reinforcement complete as per Drawaing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000m. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. | |||||
| 2Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. | |||||
| 3Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. (660) but for each coat of water proof cement paint after the first two coat to give an even shade. (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) Item no 660+ 661. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. | |||||
| 4Providing and laying of boulder apron laid in wire crates made with 4mm dia GI Wire Conforming to IS 280 & IS 4826 in 100mmx 100 mm mesh (weaved diagonally) including 10 percent extra for laps and joints laid with stone bouldres weighing not less than 40 kg each. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
Tendernotice_2.pdf
PDF • 2.22 MB
BOQ_2103264.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid