Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹18.4 L+₹1.8 L (9.70%)Accepted-AOC | L3 | Accepted-AOC Qualify in Lottery | |
| 2 | L1₹18.4 LRejected-AOC | L1 | Rejected-AOC Not Qualify in Lottery | |
| 3 | L2₹20.1 L+₹1.7 L (9.24%)Rejected-AOC | L2 | Rejected-AOC Not Qualify in Lottery |
Tender Value
₹25.9 L
EMD Value
₹25,900
Closing Date
23 Feb 2026, 10:00 amClosed
PA, ITDA, Kaptipada
At/PO- Udala
Const. of 2 Nos. Staff Qrs. at Katuria Ashram School under Kaptipada Block
2026_STSCD_125431_9
ITDAKPD-04/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Kaptipada
C and B
2 documents required · 2 mandatory
₹6,000
₹25,900
Yes
12 Jul 2026
12 Feb 2026
23 Feb 2026
12 Feb 2026
23 Feb 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in hard soil including dressing and leveling the bed up to required level stacking the excavated materials with initial lead and lift including cost of all labour T&P required for the work etc complete as per direction of the Eng.-in-charge | 71.98 | Cum | 276.9 | ₹19,931.26 |
| - | Cement concrete (1:3:6) using 4cm size black hard granite metal mixing concrete hoisting laying compacting watering curing including cost conveyance royalty taxes of all materials and cost of all labour etc. complete | 24.38 | Cum | 7,110.2 | ₹1,73,346.68 |
| - | R.C.C. M- 20 using 20 mm and down graded block hard granite crusher chips of approved quality collecting from approved quarry including mixing concrete with concrete mixture compacting with niddle / surface vibrator watering curing with cost convyance roylty & all other taxes payble to Govt. of all materials & cost of all labour T&P centering shoring required for the work excluding cost & labour charges for reinforcement etc. all complete as direced by the Eng.-In-Charge | - | - | - | - |
| - | Column Base / Foorting | 18.45 | Cum | 7,360.2 | ₹1,35,795.69 |
| - | Plinth Beam | 6.27 | Cum | 8,230.6 | ₹51,605.86 |
| - | Lintel | 3.01 | Cum | 15,023.5 | ₹45,220.73 |
| - | Chajja | 6.29 | Sqm | 1,292.5 | ₹8,129.83 |
| - | Shelves 37.5mm thick | 10.17 | Sqm | 1,100.3 | ₹11,190.05 |
| - | Column / Beam | 6.4 | Cum | 16,623.1 | ₹1,06,387.84 |
| - | Roof Slab | 13.09 | Cum | 14,608.2 | ₹1,91,221.34 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_579132.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 0.14 MB
BOQ_579132.xls
BOQ • 0.37 MB
09.pdf
Tender Documents • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .