| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance 5 8 DAKSHINPARA ROAD KOLKATA KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | -0.10% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 LAdmitted-Finance | +1.75% | ₹2.6 L | L2 | Admitted-Finance |
| 3 | L3₹2.6 LAdmitted-Finance | +3.00% | ₹2.6 L | L3 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹6,000
Closing Date
16 Feb 2026, 2:00 pmClosed
EE/TPS
Tallah Pupming Station 71 B. T Road Kolkata -2
RESTORATION SERVICE OF OVERHEAD CRANE AT PUMP ROOM OF STATION NUMBER 3 AT TALLAH PUMPING STATION
2026_KMC_990786_1
KMC/WS/TPS/66(RT)/2025-2026
Open Tender
Miscellaneous Works
20 days
Tallah Pupming Station 71 B. T Road Kolkata -2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
17 May 2026
21 Jan 2026
18 Feb 2026
21 Jan 2026
16 Feb 2026
21 Jan 2026
SEQUENTIAL DISMANTLING OF THE DIFFERENT COMPONENTS(VIZ. WHEELS,AXELS, GEAR,PINION ETC) OF THE 10 TO 12.5 MT CAPACITY HOT CRANE PART BY PART AND LOWERINGDOWN THE SAME IN THE WORKING FLOOR WITH ALL SAFETY ARRANGEMENT FOR THROUGH CHECKING PROPORLY AND COMPLETE IN ALLRESPECT AS PER DIRECTION OF EIC
SEQUENTIAL DISMANTLING OF THE LOAD CHAIN, HAND CHAIN,WITH PROPER CARE AND CAUTION AND LOWERING DOWN THE SAME AT THE WORKING FLOOR FOR DETECTING ANY FAULT AND THOROUGH CHECKING OF EACH LINK OF LOAD CHAIN ETC COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
WASHING AND CLEANING ALL THE DISMANTLED COMPONENTS BY PROVIDING REQUIRED CLEANING REAGENTS (VIZ KEROSENE OIL /DIESEL ETC) AS PER REQUIREMENT AND DO NEEDFUL FOR SERVICING AND OVERHAULING AND COMPLETE IN ALLRESPECT AND AS PER DIRECTION OF EIC.
SEQUENTIAL LIFTING OF THE DE-ASSEMBLED COMPONENTS (VIZ WHEELS,AXELS,GEAR,PINION ETC) AND DO NEEDFUL TO REASSEMBLE THE SAME WITH FITTING AND FIXING OF THE SAME AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC
LIFTING,FITING & FIXING THE LOAD CHAIN, HAND CHAIN AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
SEQUENTIAL SERVICING & OVERHAULING OF THE CRAB-TROLLY ASSEMBLY AND ITS CROSS TRAVEL AUGNMENT WITH PROPER CARE & CAUTION IN ALL RESPECT AS PER DIRECTION OF EIC
CHECKING, SERVICING & OVERHAULING OF THE BRAKE-ASSEMBLY AND ITS RATCHET LOCKING ARRANGEMENT OF THE 10 TO 12.5 MT HOT CRANE AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC
CHECKING, CLEANING AND OVERHAULING OF THE CRANE RAIL,GRANTRY GIRDER ETC WITH LONG TRAVEL ARRANGEMENT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
ARRANGEMENT TO REPLACE THE HAND CHAINS AS IS BEING USED TO OPERATE THE LOAD CHAIN OF THE 10 TO 12.5 MT CAPACITY HOT CRANE AND COMPLETE IN ALL RESPECT AS PER DIRECTION.
ARRANGEMENT TO REPLACE THE HAND CHAINS AS IS BEING USED TO MAKE THE LONG TRAVEL & CROSS TRAVEL OF THE 10 TO 12.5 MT CAPACITY HOT CRANE AND COMPLETE IN ALL RESPECT AS PER DIRECTION.
REPAIRING & OVERHAULING OF THE TROLLEY FITTED WITH THE MAIN CRANE GRIDER OF HOLDING THE 5.0 MT CAPACITY CHAIN PULLY BLOCK WITH REPLACEMENT OF DAMAGED PARTS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC BY PROVIDING ALL REQUIRED ACCESSORIES TOOLS & TACKLES ETC.
REPAIRING & OVERHAULING & LOAD TESTING OF THE 5.0 MT CAPACITY CHAIN PULLY BLOCK & ITS TROLLEY WITH REPLACEMENT OF DAMAGED PARTS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC BY PROVIDING ALL REQUIREDACCESSORIES,TOOLS & TACKLES ETC
PAINTING THE CRANE, GIRDER TROLLY AND ALL OTHER STEEL STRUCTURE AFTER SCRAPPING AND REMOVING OLD PAINTS WITH TWO COATS OF YELLOW SYNTHETIC PAINT ALL COMPLETE AS PER DIRECTION OF EIC
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(4)Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) :(Two coats)ii) Luxury Quality
BUILDING WORKS ( C ) Brickworks,Concrete Works etc 10?. Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (a) Tack weld
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (b) Continuous weld
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m
SUPPLY DELIVERY ERECTION & COMMISSIONING OF INDEF MAKE TRIPLE SPUR GEAR CHAIN PULLEY BLOCK WITH HOOK SUSPENSIONS TYPE (STANDARD LIFT OF 3MTRS) MODEL HEAVY DUTY INDEF- P-CAPACITY- 5 TON
Sub Total
L.W.Cess @1%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.90 MB
tbid66rt.pdf
Tender Documents • 0.49 MB
BOQ_2422380.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid