Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹119.6 Cr
EMD Value
₹1.2 Cr
Closing Date
12 Mar 2024, 11:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Karnataka Urban Water Supply and Drainage Board
Suma
Providing water supply system to Chikkaballapur city, Chintamani city, Gowribidanur city and 8 enroute villages, Bagepalli & Gudibande towns under AMRUT 2.0 including Operation & Maintenance for a period of 5 years (including 1 year DLP) through Design, Build, Operation and Transfer (DBOT) mode.
KUWSDB/2023-24/WS/WORK_INDENT172
KUWSDB/2023-24/WS/WORK_INDENT172
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
KUWSDB Chief Engineer Revenue zone Bengaluru
1 document required · 1 mandatory
As per clause 3 of Section 2 Instruction to Tenderers
As per clause 3 of Section 2 Instruction to Tenderers
₹7,500
₹1.2 Cr
27 Feb 2024
27 Feb 2024
15 Mar 2024
4 Mar 2024
4 Mar 2024
Providing water supply system to Chikkaballapur city, Chintamani city, Gowribidanur city and 8 enroute villages, Bagepalli & Gudibande towns under AMRUT 2.0 including Operation & Maintenance for a period of 5 years (including 1 year DLP) through Design, Build, Operation and Transfer (DBOT) mode (no variation).
I CHIKKABALLAPURA CITY Providing and Laying of PE100 PN 8 HDPE distribution pipelines of various diameter 75mm dia to 315mm dia for a length of 39.52km including necessary valves, anchor blocks, th...
Providing House service connections (15mm-3250 nos) with AMR compatible water meters with meter box including road restoration to its original position (Shall be read in conjunction with Section 7 Spe...
Construction Of One number of 10.00 Lakh Litre Capacity R.C.C Shaft Type Over Head Tank of 15 Mtr Staging at ward No. 21, with altitude control valve, sluice valve and valve chamber etc., complete ...
Construction of One number of 5.00 LL Cap. of 15Mtr Staging RCC OHT near BB road teachers layout ward No. 14 with altitude control valve, sluice valve and valve chamber etc., complete (Shall be rea...
Providing & Laying of DI -K-7 Feeder line to Newly Proposed OHT's 150mm dia to 200mm dia - 1040 mtr, including sluice valve, air valve anchor blocks, thrust blocks, valve chamber etc., complete (...
Repairs to Existing 8 numbers of OHTs in Chikkaballapur City etc., complete(Shall be read in conjunction with Section 7 Specifications Special specifications for all the items) with all lead and lif...
Online Monitoring system to Jackwell, IPS , 14.85 MLD WTP and OHT with bulk flow meters at inlet and outlet of existing and proposed OHT's, Jackwell, IPS, WTP etc., complete., (Shall be read in conjun...
II- CHINTAMANI CITY Renovation and upgradation of WTP including civil and electromechnical at Agrahara layout in Chintamani city from 1.50 MLD to 3.00 MLD etc., complete (Shall be rea...
Renovation and upgradation of WTP including civil and electromechnical at Ashraya layout in Chintamani city from 1.63 MLD to 3.00 MLD etc., complete(Shall be read in conjunction with Section 7 Specifi...
Providing and laying of 150mm to 250mm dia DI K-9 feeder line (L-5.95 Km) from existing WTPs to existing OHT's/GLSR including sluice vlave, airvalve, bulk flow meters (Inlet and outlet of OHT'S, WTP'...
Dismantling of existing 5.00 LL 15Mtr Staging RCC OHT behind Inspection Banglow in Chintamani city etc., complete (Shall be read in conjunction with Section 7 Specifications, Special specifications f...
Construction of 10.00 LL 15Mtr Staging RCC OHT behind Inspection Banglow in Chintamani city with altitude control valve, sluice valve and valve chamber etc., complete (Shall be read in conjunction w...
Providing house service connections - 15mm dia for 3500 nos with AMR compatible water meters with meter box including road restoration to its original position etc., complete (Shall be read in conjun...
Supply, erection, electrification and commissioning of 2 numbers of 40HP or suitable Centrifugal pumpsets with accessories for pumping pure water from Ashraya Layout WTP to various OHT's/ GLSR in Chi...
Supply and Erection of 1 number of 30/suitable H.P. centrifugal Pumpset at Kolar Circle pumphouse (H=50.00 mtr, LPS = 27.78) and 40/suitable H.P. centrifugal Pumpset at Sidlaghatta road pumphouse (H...
Supplying, Installing, and Commissioning of Online Monitoring System to Jackwell, WTP and GLSR at Agrahara WTP & Ashraya WTP, RTU panels at OHT's (existing and proposed) etc., complete (Shall be rea...
III GOWRIBIDANUR CITY Construction of 5x6 mtr housing chamber with foot bridge along with Coffer dam at Vatadahosahalli tank in Gowribidanur city including electrification etc., complete (Shall be rea...
Providing laying, jointing, Testing & Commissioning of 610 mm Dia x 5.6 mm thick MS raw water rising main from Vatadahosahalli tank to proposed WTP at Gotakanapura village (L=17,960.00 mtrs) with bulk...
Construction of 20.00 MLD WTP including electrification at Gotakanapura village etc., complete (Shall be read in conjunction with Section 7 Specifications, Special specifications for all the items) w...
Providing and laying of various diameter DI K9 class (200mm to 450mm ) /MS (508mm to 559mm / HDPE (200mm PE 100 PN8) feeder line from proposed WTP to existing OHT's water rising main from Vatadahosaha...
Providing house service connections - 15mm dia for 1200 nos with AMR compatible water meters with meter box including road restoration to its original position etc., complete (Shall be read in conj...
Providing & laying of PE 100 PN 8 HDPE distribution to Zone-2- 21411mtrs(75mm to 250mm) including necessary valves, anchor blocks, thrust blocks, valve chamber etc., complete (Shall be read in conju...
Supply, erection, electrification and commissioning of 75 HP/ Suitable HP 2 Nos of Centrifugal Submersible pumpsets with allied accessories for pumping Raw water from Jackwell at Vatadahosahalli tank...
Supply, erection, electrification and commissioning of 2 Nos of 200HP /Suitable HP Horizontal Centrifugal Submersible pumpsets with allied accessories at proposed WTP at Gotakanapura village to pump...
11KV express feeder line from MUSS at Vatadahosahalli village to Jackwell at Vatadahosahalli tank (L-3.00 Kms) etc., complete (Shall be read in conjunction with Section 7 Specifications Special specif...
11KV express feeder line from Chikkirgodu NGY (from Vidrashwat MUSS) to Proposed 20.00 MLD WTP at Gotakanapura village (3.50 kms ) etc., complete (Shall be read in conjunction with Section 7 Specific...
Supplying, Installing, and Commissioning of Online Monitoring System to Jackwell and WTP, OHT's etc., complete (Shall be read in conjunction with Section 7 Specifications, Special specifications for ...
Rennovation of Existing OHTs in Gowribidanur city etc., complete (Shall be read in conjunction with Section 7 Specifications, Special specifications for all the items) with all lead and lift as direc...
IV BAGEPALLI TOWN Renovation of 3.40 MLD WTP including civil and electromechanical near sante maidan in Bagepalli town etc., complete (Shall be read in conjunction with Section 7, Specifications Speci...
Construction of one number of 15LL capacity 15Mtr staging shaft type RCC OHT near Saibaba temple, Ward No. 1 in Bagepalli town with altitude control valve, sluice valve and valve chamber etc., complet...
Construction of one number RCC sump of one lakh liter capacity (1LL) near reddy kere with sluice valve and valve chamber etc., complete (Shall be read in conjunction with Section 7 Specifications, ...
Construction of one number of pumphouse (3mtr X 3mtr)near Reddykere at propsed sump etc., complete(Shall be read in conjunction with Section 7 Specifications, Special specifications for all the items)...
Repairs to Existing 4 numbers of OHT's in Bagepalii town etc., complete (Shall be read in conjunction with Section 7 Specifications, Special specifications for all the items) with all lead and lift a...
Providing and laying of 200 and150 mm diameter DI K-9 feeder line from existing WTP and Reddykere pumphouse to 15.00 LL OHT near Saibaba temple, ward no.1 in Bagepalli town. (L-3.00 Km) with bulkflow...
Providing and laying 75mm to 200mm dia PE100 PN8 HDPE and 300mm to 350mm dia DI K-7 distribution line from OHTs. (L-11.795 Km) including necessary valves, anchor blocks, thrust blocks, valve chamber ...
Providing house service connections 15mm-1200 Numbers with AMR compatible water meters with meter box including road restoration to its original position etc., complete (Shall be read in conjunction ...
Supply, erection, electrification and commissioning of 2 numbers of 25HP or suitable Deep well verticle turbine pumpsets with accessories for pumping raw water from Jackwell in Chitravati reservoir t...
Supply, erection, electrification and commissioning of 2 numbers of 60HP or suitable Centrifugal pumpsets with accessories at Pure water Pump House in 3.40 MLD WTP near Sante Maidan for pumping pure ...
Supplying, Installing, and Commissioning of Online Monitoring System to Jackwell, WTP and OHTs of water supply scheme to Bagepalli town (Shall be read in conjunction with Section 7 Specifications, Spe...
V GUDIBANDE TOWN Construction of 5x6 mtr housing chamber with foot bridge along with Coffer dam, including bulkflow meters, electrification etc., complete (Shall be read in conjunction with Section ...
Providing and laying of 250 mm diameter DI K-9 Rising main from Housing chamber to existing WTP (L = 275.00 Mtr) with bulkflow meters at WTP, inlet and outlet of proposed and existing OHT's etc, comp...
Renovation and Upgradation of existing WTP including civil and elctromechanical from 1.63 MLD TO 3.00 MLD at Gudibande town etc., complete (Shall be read in conjunction with Section 7 Specifications,...
Dismantling of Existing OHT at Bapooji nagar hillock etc., complete (Shall be read in conjunction with Section 7 Specifications, Special specifications for all the items) with all lead and lift as di...
Construction Of One number of 5.00 Lakh Litre Capacity R.C.C Shaft Type Over Head Tank on 15 Mtr Staging at Bapuji Nagar with altitude control valve, sluice valve and valve chamber etc., complete (S...
Repairs to Existing 1 No. of OHTs & 6 No. GLSRs etc., complete (Shall be read in conjunction with Section 7 Specifications, Special specifications for all the items) with all lead and lift as directed...
Providing and laying of 75mm to 250mm diameter PE100 PN 8 HDPE distribution line from OHT's (L = 32,722.00 mtr) and 100mm to 300mm dia DI K-7 class pipe for drainage crossing (L=1,900.00mtr) includin...
Providing house service connections - 15mm dia for 2500 numbers with AMR compatible water meters with meter box including road restoration to its original position etc., complete (Shall be read in ...
Supply, erection, electrification and commissioning of 10 HP/ Suitable HP 2 Nos of Verticle Centrifugal Submersible pumpsets with allied accessories (100% stand by) for pumping Raw water from Jackwel...
Supply, erection, electrification and commissioning of 2 Nos of 70HP /Suitable HP Centrifugal Pumpset with accessories (100% stand by including dismantling of existing pumpset and acessories) at ex...
Supplying, Installing, and Commissioning of Online Monitoring System to Jackwell, WTP and OHTs (Shall be read in conjunction with Section 7 Specifications, Special specifications for all the items) w...
I- CHIKKABALLAPURA CITY
Operation & Maintenance during the 1st year for the assets built under this contract (Shall be read in conjunction with Section 7 Specifications, Special specifications for al...
O & M for 2nd year.
O & M for 3rd year.
O & M for 4th year.
O & M for 5th year.
PART B OPERATION AND MAINTENANCE
II -CHINTAMANI CITY
Operation & Maintenance during the 1st year for the assets built under this contract (Shall be read in conjunction with Section 7 Specifications, ...
O & M for 2nd year.
O & M for 3rd year.
O & M for 4th year.
O & M for 5th year.
III -GOWRIBIDANUR CITY
Operation & Maintenance during the 1st year for the assets built under this contract (Shall be read in conjunction with Section 7 Specifications, Special specifications for all...
O&M for 2nd Year
O&M for 3rd Year
O&M for 4th Year
O&M for 5th Year
IV -BAGEPALLI TOWN
Operation & Maintenance during the 1st year for the assets built under this contract (Shall be read in conjunction with Section 7 Specifications, Special specifications for all the...
O&M for 2nd Year
O&M for 3rd Year
O&M for 4th Year
O&M for 5th Year
V-GUDIBANDE TOWN
Operation & Maintenance during the 1st year for the assets built under this contract (Shall be read in conjunction with Section 7 Specifications, Special specifications for all the i...
O&M for 2nd Year
O&M for 3rd Year
O&M for 4th Year
O&M for 5th Year
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
CBP 5 towns Section-7, 27-02-2024.pdf
Tender Document • 5.29 MB
DTS_Kolar 27-02-2024 up load.pdf
Tender Document • 5.79 MB
Gudibande Distribution Key Map.pdf
Others - drawings • 2.19 MB
7.Bagepalli Distribution Network_20012024.pdf
Others - drawings • 3.78 MB
Diawise_CBP_SS-R2-A0-ALL.pdf
Others - drawings • 2.78 MB
CNT Amrut Schematic_final 2010-Model.pdf
Others - drawings • 0.43 MB
Gudibande Distribution Zone 2.pdf
Others - drawings • 2.12 MB
7.Bagepalli SD.pdf
Others - drawings • 0.20 MB
Distribution Network of Gouribidanur_25012024.pdf
Others - drawings • 0.72 MB
Gouribidanur Raising Main of Gouribidanur_24012024.pdf
Others - drawings • 1.13 MB
7. Bagepalli Raising Main_20012024.pdf
Others - drawings • 3.81 MB
Gudibande Raising Main Key Map.pdf
Others - drawings • 0.66 MB
Gudibande Distribution Key Map.pdf
Others - drawings • 2.19 MB
standardspecifications.pdf
Others - standard specification • 3.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .