Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.6 LAdmitted-Finance | -36.36% | ₹37.6 L | L1 | Admitted-Finance |
| 2 | L2₹38.3 LAdmitted-Finance | -35.07% | ₹38.3 L | L2 | Admitted-Finance |
| 3 | L3₹39.6 LAdmitted-Finance | -32.94% | ₹39.6 L | L3 | Admitted-Finance |
| 4 | L4₹42.7 LAdmitted-Finance 14 ILTIFATGANJ AMBEDKAR NAGAR UTTAR PRADESH 224145 UDYAM UP 04 0036158 | AMBEDKAR NAGAR | UTTAR PRADESH | 224145 | -27.72% | ₹42.7 L | L4 | Admitted-Finance |
| 5 | L5₹44.2 LAdmitted-Finance | -25.02% | ₹44.2 L | L5 | Admitted-Finance |
Tender Value
₹59.0 L
EMD Value
₹1.2 L
Closing Date
13 Aug 2026, 3:00 pmClosed
EE CD XI IFC DEPTT
OFFICE OF EE CD XI IFC DEPTT SECTOR-15 ROHINI DELHI
Providing and Laying of RCC Pipe along Sub Minor in Village Bakkarwala for Supplying of Irrigation water Revised.
2026_IFC_296577_1
EE/CD-XI/NIT-31/2026-27
Open Tender
Civil Works
Percentage
90 days
dELHI
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.2 L
13 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 95 | Cubic Metre | 2,064.71 | ₹1,96,147.45 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 61 | Cubic Metre | 260.87 | ₹15,913.07 |
| 3 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil Pipes, cables etc. exceeding 300 mm dia but
not exceeding 600 mm | 1,400 | Metre | 550.96 | ₹7,71,344 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 120 | Cubic Metre | 7,310.67 | ₹8,77,280.4 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 153 | Cubic Metre | 7,147.87 | ₹10,93,624.11 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7 | Cubic Metre | 8,358.72 | ₹58,511.04 |
| 7 | 15 mm cement plaster : 1:4 (1 cement : 4 coarse sand) | 324 | Square Metre | 412.65 | ₹1,33,698.6 |
| 8 | 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) | 324 | Square Metre | 426.48 | ₹1,38,179.52 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 49 | Cubic Metre | 196.43 | ₹9,625.07 |
| 10 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 95 | Cubic Metre | 264.52 | ₹25,129.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.40 MB
BOQ_394862.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].