Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.7 LAccepted-AOC 1627 SECTOR 26 PANCHKULA | ₹8.7 L | 1 | Accepted-AOC DUE TO L-1 AGENCY |
| 2 | 2₹8.8 LRejected-Finance 0 A K ENTERPRISES SADAR ROAD BALOD GANGA MAIYA BOOK DIPO NEAR BALOD CHHATTISGARH 491226 UDYAM CG 17 0002983 | BALOD | CHHATTISGARH | 491226 | ₹8.8 L | 2 | Rejected-Finance RATE ON HIGHER SIDE |
| 3 | 3₹9.1 LRejected-Finance 2789 1 FLOOR SECTOR 37 C CHANDIGARH | ₹9.1 L | 3 | Rejected-Finance RATE ON HIGHER SIDE |
| 4 | 4₹10.0 LRejected-Finance 11 NO 870 SECTOR 13 A CHANDIGARH | ₹10.0 L | 4 | Rejected-Finance RATE ON HIGHER SIDE |
| 5 | Rejected-Technical 1017 SMALL FLAT DHANAS U T CHANDIGARH | - | - | Rejected-Technical AFFIDAVIT NOT IN ORDER |
Tender Value
₹14.2 L
EMD Value
₹28,467
Closing Date
27 Jan 2026, 11:00 amClosed
XEN CP3
XEN CP3 SECTOR 16 CHD
ROOF TREATMENT AND OTHER MISC. WORK IN GIRLS HOSTEL BLOCK AT HOME SCIENCE COLLEGE SECTOR 10 CHANDIGARH.
2025_CHD_88235_2
CP3/2025/2288580
Open Tender
Civil Works
90 days
SECTOR 10 CHANDIGARH.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,467
24 Feb 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
Regrading terracing of mud phaska covered with tiles or brick, in cement mortar by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1 cement : 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded), all complete as per direction of Engineer-in-Charge
Removing the earth filling under tiles and cleaning and scraping old bitumen of the roof surface with wire brushes and refiiliing the earth after cleaning etc complete in all respect engineer in charge.
Providing and laying in situ five course water proofing treatment with APP (Atactic Polypropylene) modified Polymeric memberane over roof consisting of first coat of bitumen primer @ 0.40 litre per sqm, 2nd & 4th courses of bonding material @ 1.20 kg/sqm, which shall consist of blown type bitumen of grade 85/25 conforming to IS : 702, 3rd layer of roofing membraneAPP modified Polymeric membrane 2.0 mm thick of 3.00 Kg/ sqm weight consisting of five layers prefabricated with centre core as 100 micron HMHDPE film sandwiched on both sides with polymeric mix and the polymeric mix is protected on both side with 20 micron HMHDPE film. 5th, the top most layer shall be finished with brick tiles of class designation 10 grouted with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% integral water proofing compound by weight of cement over a 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat (item of laying brick tiles shall be paid for separately)
Supply of 1st quality brick tiles 9"x 4 1/2"x 1 1/2" complete in all respect and to the entire satisfaction of Engineer-in-Charge.
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : In 75x75 mm deep chase
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Analysis of rate for providing and fixing factory manufactured precast concrete Channel of size 300mm x 300mm having 100mm thickness duly vibrated, mechanically and compacted made of P.C.C 1:2:4 duly cured and finished. The rate further include filling of joints between kerb with cement mortar 1:2 complete in all respects and to the entire satisfaction of the Engineer-in-Charge.
Analysis of rate for providing and fixing factory manufactured precast Kerb of size 300mm x 300mm having 100mm thickness duly vibrated, mechanically and compacted made of P.C.C 1:2:4 duly cured and finished. The rate further include filling of joints between kerb with cement mortar 1:2 complete in all respects and to the entire satisfaction of the Engineer-in-Charge.
Dismantling old plaster or skirting raking out joints and cleaning thesurface for plaster including disposal of rubbish to the dumping groundwithin 50 metres lead
12 mm cement plaster of mix: 1:4(1 cement: 4 fine sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.67 MB
BOQ_110259.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid