| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC CHENGALPATTU TAMIL NADU | CHENGALPATTU | TAMIL NADU | 600043 | ₹1.3 Cr | L1 | Accepted-AOC l1 |
| 2 | L2₹1.3 Cr+₹1.1 L (0.89%)Rejected-Finance 5 E B 607003 | CUDDALORE | TAMIL NADU | 607003 | ₹1.3 Cr+₹1.1 L (0.89%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
30 Jun 2025, 3:00 pmClosed
Additional Collector, DRDA Office, Cuddalore
DRDA Office, Cuddalore
Strengthening of Agaraputhur Sithamalli road Km 0/0-2/0 at Kattumannarkoil Block in Cuddalore District
2025_RDTN_567200_1
A10/1409/2025 NABARD XXXI 2025-26-07
Open Tender
Civil Works - Roads
Item Wise
180 days
Kattumannarkoil Block
As per the Technical Bid
2 documents required · 2 mandatory
₹0
₹1.4 L
DRDA Office Meeting Hall, Cuddalore
14 Jul 2025
11 Jun 2025
30 Jun 2025
11 Jun 2025
30 Jun 2025
11 Jun 2025
11 Jun 2025 - 16 Jun 2025
13 Jun 2025
Amount
Strengthening of Agaraputhur Sithamalli road Km 0/0-2/0 at Kattumannarkoil Block
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.
Earth work excavation and depositing on bank within initial lead and lift OF Hard Stiff Clay, Stiff Clay Cotton, Hard Red Earth, Shales, Murrum, Gravel, Stoney Earth and Earth Mixed with Samall Size buolders SS 20A including laying and Spreading in layers of 250 mm loase thick each, sectioning watering and Compacting etc., Complete as per MOST 301-305.
Providingand Laying US Gravel including cost and conveyance Garvel form Approved Sources to worksite and stocking on road side to Departmental meric gauge fro premeasurement as directed including labour for spreading and Compacting etc., Complete ar per MORD Specification No.400.
Providing and laying Spreading and compacting graded stone aggregate to wet Mix Macadam (WMM) Specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by Tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achive the desired density including cost of Materials Labour charges rentals for Machinary , Fuel and all other incidential charges etc., Complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying tack coat over the WMM surface (Treated with primer) using 2.5 Kg of bituminous emulsion RS-01 for 1 sqm. for preparatory to another Bituminous construction over it including cost of Material, labour charges, rentals for Machinary, Fuel and all other incidential cahrges etc., Complete.
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
Providing and laying Bituminious concrete to 25, 30/40 MM Thick Using CMP(Grade-II) - Providing Bituminous Concrete to 40 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Hm Stone
Provision for Km Stone
Provision for 60mm Equilateral Triangle Cautionary Sign Board
Provision for Road Marker/Road Stud with lens Reflector
Provision for Nameboard
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
DEVI CONSTRUCTIONS (BID ID -1380035)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .