| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.3 LAdmitted-Finance 45 GANPATI NAGAR SHIPRA PATH MANSAROVAR JAIPUR RAJASTHAN 302020 | JAIPUR | RAJASTHAN | 302020 | -5.61% | ₹28.3 L | L1 | Admitted-Finance |
| 2 | L2₹29.2 LAdmitted-Finance 37 RK PURAM COLONY SITAPURA JAIPUR RAJASTHAN 302022 | JAIPUR | RAJASTHAN | 302022 | -2.75% | ₹29.2 L | L2 | Admitted-Finance |
| 3 | L3₹29.9 LAdmitted-Finance A 87 SUMER NAGAR EXTENSION GOLYAWAS JAIPUR JAIPUR RAJASTHAN 302020 | JAIPUR | RAJASTHAN | 302020 | -0.21% | ₹29.9 L | L3 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
19 May 2026, 6:00 pmClosed
EXECUTIVE ENGINEER MANSAROVER ZONE
JAIPUR NAGAR NIGAM PANDIT DEENDAYAL UPPADHYAY BHAWAN LALKOTHI TONK ROAD JAIPUR
CONSTRUCTION WORK FOR AN ADDITIONAL FLOOR (APPROXIMATELY 2000 SQ. FT) COMPRISING TWO TOILETS AND TWO BATHROOMS, ATOP THE KAMLA NEHRU NAGAR COMMUNITY CENTER
2026_DLB_557840_1
07 EXECUTIVE ENGINEER MANSAROVER ZONE
Open Tender
Construction Works
180 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹590
ONLINE PAY IN JAIPURMC WEBSITE
₹60,000
Yes
21 May 2026
9 May 2026
20 May 2026
9 May 2026
19 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (2.4.2) Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks | 1.86 | Cum | 678 | ₹1,261.08 |
| 2 | (24.5.2) Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 52.66 | Cum | 6,300 | ₹3,31,758 |
| 3 | (24.12.2) Half brick masonry with FPS bricks of class designation 75 in superstructure above plinth level upto two stories:-Cement mortar 1:4 (1 cement :4 coarse sand | 64.5 | sqm | 767 | ₹49,471.5 |
| 4 | (23.19.1 ) Reinforcement for R.C.C. work at all levels including straightening,cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars | 7,430 | Kg | 83.3 | ₹6,18,919 |
| 5 | (22.1.6) Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts. | 134.4 | sqm | 375 | ₹50,400 |
| 6 | (22.1.3 ) Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform | 192 | sqm | 456 | ₹87,552 |
| 7 | (22.1.5) Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers | 67.2 | sqm | 426 | ₹28,627.2 |
| 8 | (23.2.2) Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size) | 9.94 | Cum | 7,380 | ₹73,357.2 |
| 9 | (23.3.2) Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, taircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortarM-20 Grade Concrete (1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) -As per design mix) | 53.14 | Cum | 7,660 | ₹4,07,052.4 |
| 10 | (32.3.3) Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand) | 603.45 | sqm | 294.5 | ₹1,77,716.03 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
EPROC07XENMNSZ.pdf
Tender Documents • 4.28 MB
BOQ_993129.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid