Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.1 LAccepted-AOC | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹7.3 L+₹22,719 (3.20%)Rejected-Finance | 2 | Rejected-Finance 2 |
Tender Value
Refer Docs
EMD Value
₹14,800
Closing Date
13 Feb 2021, 12:00 pmClosed
Executive Engineer
U.M.B.D.G.C.KHURJA
CONSTRUCTION OF V.R.B.
2021_UPIDC_548134_32
06/EE/2020-21 U.M.B.D.G.C.Khurja
Open Tender
Civil Works - Canal
Item Rate
30 days
U.M.B.D.G.C.KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹14,800
3 Apr 2021
8 Feb 2021
13 Feb 2021
8 Feb 2021
13 Feb 2021
8 Feb 2021
Amount
Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P.
C.C. 1:3:6 in foundation with cement, coarse sand, Crushed stone Aggregate 10 to 25 mm i/c cost of all Material Labour and T&P.
Brick Work (M-100) in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P.
Centering & Shuttering of C.C. & R.C.C. work including all cost of material, labour & T&P.
12 mm Thick Cement Plaster in 1:4 C.M. including all cost of material, labour & T&P.
R.C.C. in 1:1:2 with cement, coarse sand and Crushed stone Aggregate 10 to 25 mm gauge including all cost of material, labour & T&P.
C:C 1:1.5:3 in cement, coarse sand and Crushed stone grit 10 to 25 mm gauge including all cost of material, labour & T&P.
Steel Reinforcement Work i/c Cutting, Bending, Binding & Placing of i/c cost of binding wire & Steel i/c all cost of material, labour & T&P.
Supplying & Fixing 75 mm dia Drainage Pipe
Earth Work in Filling including lead upto 600M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all cost of material, labour & T&P.
Supplying Laying of one layer of Tar felt I.S.I marked at the junction of wall and roof or any place i/c necessary overlap giving a coat of approved mastic paint below the tar felt i/c cost of all material ,labour and T&P.
Colour Washing Two coat including Cost of all material & T&P etc required for proper completion of work.
S/F Sign board including painting & lettering with all cost of material, labour and T&P.
M/s ANWAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .