Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | -13.00% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 L+₹22,508.07 (13.3%)Admitted-Finance | -1.39% | ₹1.9 L+₹22,508.07 (13.3%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹34,896.24 (20.7%)Admitted-Finance | +5.00% | ₹2.0 L+₹34,896.24 (20.7%) | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
28 Jul 2026, 4:00 pmClosed
Executive Engineer Rnb Divisdion Dalgate Srinagr
Executive Engineer Rnb Divisdion Dalgate Srinagr
Construction of culvert at Bandan Mohalla Akhoon Mohalla at Mir Behri Dal.
2026_PWDJK_317389_5
Nit-39 of RNB/4519-4526/2026-27 dtd.22-07-2026
Open Tender
Civil Works
Percentage
20 days
Behri Dal.
as per Nit
2 documents required · 2 mandatory
₹200
Executive Engineer Rnb Divisdion Dalgate Srinagr
₹3,880
5 Aug 2026
23 Jul 2026
29 Jul 2026
23 Jul 2026
28 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Shikara / kuch with labour for driving of wooden piles in to Nallah bed upto required depth and making of frame work (excluding the cost of materials) as per direction of EIC complete in all respects. | 7 | Days | 1,694.92 | ₹11,864.44 |
| 2 | Providing and fixing of wood work in frames, beams, trusses, struts, purlins, rafters etc including the cost of nails, nuts, nolts washers using KIKAR wood. | 85.41 | Cft | 983.9 | ₹84,034.9 |
| 3 | Providing and fixing of wood work in planks 40 mm thick in floors including the cost of nails, nuts, bolts washers using KIKAR Wood. | 210 | Sft | 163.98 | ₹34,435.8 |
| 4 | Applying priming coat With ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood). | 85.87 | Sqm | 54.75 | ₹4,701.38 |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work. | 85.87 | Sqm | 111.74 | ₹9,595.11 |
| 6 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 85.87 | Sqm | 12.29 | ₹1,055.34 |
| 7 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 1 mm thick | 25.76 | Sqm | 117.03 | ₹3,014.69 |
| 8 | Engagement of skilled / unskilled for cutting repairing of wooden planks and all allied works. | - | - | - | - |
| 9 | a) Labour. | 10 | No | 550.85 | ₹5,508.5 |
| 10 | b) Carpenter. | 14 | No | 720.34 | ₹10,084.76 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1039931.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .