| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.7 LAdmitted-Fee/PreQual/Technical/Finance | -19.11% | ₹13.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.0 L+₹22,794.83 (1.66%)Admitted-Fee/PreQual/Technical/Finance | -17.77% | ₹14.0 L+₹22,794.83 (1.66%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.3 L+₹53,221.93 (3.87%)Admitted-Fee/PreQual/Technical/Finance | -15.98% | ₹14.3 L+₹53,221.93 (3.87%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹15.0 L+₹1.2 L (9.04%)Admitted-Fee/PreQual/Technical/Finance | -11.80% | ₹15.0 L+₹1.2 L (9.04%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹17 L
EMD Value
₹34,000
Closing Date
25 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SMC REGAL LANE LAL CHOWK
Construction of lane, tiles from Nazir Ah Bhat to Mushtaq Ah Malik via Mukhtar Kumhar at Kumhar Mohalla Harwan
2026_HAUDD_319413_22
NOTICE INVITING ETENDER No. 25 of 2026-2027 Dated 04.08.2026 RRWD SMC
Open Tender
Civil Works
Percentage
90 days
Nazir Ah Bhat to Mushtaq Ah Malik via Mukhtar Kum
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹802
FA/CAO AC NO 0216010200000007
₹34,000
29 Aug 2026
5 Aug 2026
27 Aug 2026
6 Aug 2026
25 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge 1:3:6 or richer mix (i/c equivalent design mix) | 3.96 | Cum | 1,725.2 | ₹6,831.79 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kinds of soil | 118.27 | Cum | 479.3 | ₹56,686.81 |
| 3 | Providing & laying stone soiling including compacting, watering including all carriages of material complete | 0.67 | Cum | 850 | ₹569.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 13 | Cum | 5,202.9 | ₹67,637.7 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 2.15 | Cum | 7,788.4 | ₹16,745.06 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 5.55 | Cum | 6,591.25 | ₹36,581.44 |
| 7 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 8.36 | Sqm | 416.5 | ₹3,481.94 |
| 8 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In cement mortar | 3.82 | Cum | 1,458.45 | ₹5,571.28 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 12.96 | Cum | 7,571.55 | ₹98,127.29 |
| 10 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 12.96 | Cum | 1,455.65 | ₹18,865.22 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1059442.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .