Tender Value
₹4.8 L
EMD Value
₹4,750
Closing Date
14 Jul 2026, 3:00 pm6d left
Block development officer(B.P),Sirkali Block
Block development officer(B.P),Sirkali Block
Construction of Cremation shed at SC in Karaimedu Panchayat IN SIRKALI BLOCK MPLADS 2025-2026
2026_RDTN_683707_1
3588/2025/A4
Open Tender
Civil Works
120 days
Block development officer(B.P), Sirkali Block
refer tender notice
6 documents required · 6 mandatory
₹0
₹4,750
Yes
Block development officer(B.P),Sirkali Block
3 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
3 Jul 2026 - 3 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Cremation shed at SC in Karaimedu Panchayat | - | - | - | - |
| 2 | Earth work excavation in classes all clasess of soils and depositing on bank with initial lead and lift soils such as, sand, or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, block cotton soil, red earth, earth mixed width 50% fair sized boulders etc., except hard rock which requires blasting as per SS20B, including all labour for balling out water if necessary and all labour and other incidental charges etc. complete for FOUNDATION. | 18.62 | cum | 263.78 | ₹4,911.58 |
| 3 | Filling with river sand into foundation and basement including cost and conveyance of sand to worksite including labour for filling, watering within 200m lead for good water, including tamping if necessary, and all labour and all other incidental charges etc., complete for FOUNDATION / BASEMENT. | 12.11 | cum | 2,540.95 | ₹30,770.9 |
| 4 | Cement Concrete 1: 4 : 8 mix using 40mm ISS Size HBG metal from approved quarry, including cost and conveyance of all materials to worksite, including labour for mixing, laying the concrete the concrete watering within 200m lead for good water, and compacting the concrete including labour and all other incidental charges etc., complete for FOUNDATION / BASEMENT. | 10.12 | cum | 6,576.02 | ₹66,549.32 |
| 5 | Cement Concrete 1: 3: 6 mix using 20mm ISS Size HBG metal from approved quarry, including cost and conveyance of all materials to worksite, including labour for mixing, laying the concrete the concrete watering within 200m lead for good water, and compacting the concrete including labour and all other incidental charges etc., complete. | 2.93 | cum | 7,375.67 | ₹21,610.71 |
| 6 | Cement Concrete 1: 2 : 4 mix using 20mm ISS Size HBG metal from approved quarry, including cost and conveyance of all materials to worksite, including labour for mixing, laying the concrete the concrete watering within 200m lead for good water, and compacting the concrete including labour and all other incidental charges etc., complete. | 7.73 | cum | 8,012.87 | ₹61,939.49 |
| 7 | Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS size HBG metal from approved quarry, including cost and conveyance all materials to worksite including labour for mixing, laying, watering with in 200m lead for good water, compacting the concrete including all labour for forming formwork and centering charges etc., (but excluding const and conveyance steel reinforcement ) and all labour and all other incidental charges etc., complete for UP TO BASEMENT | 3.24 | cum | 10,539.64 | ₹34,148.43 |
| 8 | Brick work in C.M 1:5 mix using country bricks of size 83/4” x 41/4 " x 21/4" , including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m Lead for good water, including all labour and all other incidental charges etc. complete for ABOVE BASEMENT. | 0.49 | cum | 6,344.1 | ₹3,108.61 |
| 9 | Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS size HBG metal from approved quarry, including cost and conveyance all materials to worksite including labour for mixing, laying, watering with in 200m lead for good water, compacting the concrete including all labour for forming formwork and centering charges etc., (but excluding const and conveyance steel reinforcement ) and all labour and all other incidental charges etc., complete for ABOVE BASEMENT . | 2.83 | cum | 10,680.71 | ₹30,226.41 |
| 10 | Supply and fabrication of steel including cost and conveyance of steels from godown to worksite including labour for cutting, jointing and welding is necessary including labour for dying with binding wire and labour for placing in position as directed by departmental officers, including all labour and all other incidental charges etc., complete for all R.C.C items. | 0.57 | MT | 92,193.5 | ₹52,550.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
SklPriceBid.pdf
Tender Documents • 0.40 MB
BOQ_821863.xls
BOQ • 0.26 MB
SklTechnicalBid.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid