Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC COLLINPUR SOUTH ANDAMAN | L1 | Accepted-AOC Low Quoted | |
| 2 | L2₹7.9 L+₹1.2 L (18.1%)Rejected-AOC | L2 | Rejected-AOC High Quoted |
Tender Value
₹8.0 L
EMD Value
₹15,913
Closing Date
6 Feb 2023, 3:00 pmClosed
Executive Engineer
Executive Engineer (PRI) South Andaman Division-I No. J/4, Old Councilor Bungalow, Junglighat, Port Blair, South Andaman
Renovation of CC Footpath with drain and hand railing from Dispensary to Sushil Sarkar house at Templemeyo, under Gram Panchayat Collinpur.
2023_RDPRI_9057_1
EE/PRI/SAD-I/GEN/2022-23/113
Open Tender
Civil Works - Others
Works
90 days
Collinpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, GPPS
₹15,913
14 Jun 2023
25 Jan 2023
6 Feb 2023
26 Jan 2023
6 Feb 2023
26 Jan 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.
G.I. pipes
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete
12 mm cement plaster of mix:
1:4 (1 cement:4 fine sand)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate
12 mm cement plaster finished with a floating coat of neat cement of mix :
1:3 (1 cement: 3 fine sand)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
SONU CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .