Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC 280280.00 AOC |
| 2 | L2₹4.8 LRejected-Finance | ₹4.8 L | L2 | Rejected-Finance Price Rejected L2 |
| 3 | L3₹4.9 LRejected-Finance | ₹4.9 L | L3 | Rejected-Finance Price Rejected L3 |
| Sl No | Description | Qty | Unit | BLUSCAPE INTERNATIONAL L1 | NITIN KUMAR YADAV L3 | REWANSH CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00Work Name - Annual Per And Post Monsoon Maintenance Work At Ghats At Lamehtaghat | ||||||
| 2.00 | Dismanting, shifting and re installation of detachable steel sheds structures (at bhedaghat dhuadhar, lamhetaghat, panchwati ghat and saraswati ghat) detachable steel ralling (at Bhedaghat dhuadhar, panchwati ghat) sheds of boats (at panchwati ghat) detachable steel chairs, 08 changing room steels doors (at panchwati ghat and lamhetaghat), rolling shutters (at panchwati ghat) and steel entrance gate form/near ghats before monsoon season and re erection of the same (as it is after monsson inculing roofing sheets, removing and refixing foundation bolts, nuts, welding wherever requred alignment shifting all complete as per directed by Engineer in chargar.) 2. Dismanting, shifting (before monsson season) and re erection (after monsson) of exsting high mast lighting pole and 9 electricity poles at dhuadhar poles at dhuadhar bhedaghat including alignmnet and tightening of foundation bolts, shifting all complete as per directed by Engineer in charge. 3. Light, shifting (before monsoon season) and re-plancing (after monsson) detachable steel bridge structure at dhuadhar view pint using suitable machinery including alignment, refixing, shifting all complete as per directed by Engineer in Charge | 1 | Lumpsum | 2,80,000 ₹2,80,000 Lowest | 3,88,786 ₹3,88,786 | 3,80,566.66 ₹3,80,566.66 |
| 3.00 | Removal of Deposited sand silt, mud and debris form saraswati ghat and panchwati ghat area and platforms areas after flood including removing landing trasportation and disposal of the same up to specified lead of upto 1 km as per directed by Engineer In Chagre. | 1 | CUM | 280 ₹280 Lowest | 97,000 ₹97,000 | 94,666.66 ₹94,666.66 |
Tender Value
₹5.1 L
EMD Value
₹5,200
Closing Date
30 May 2026, 5:30 pmClosed
C.M.O. Nagar Parisad Bhedaghat, Jabalpur
C.M.O. Nagar Parisad Bhedaghat, Jabalpur
Annual Per And Post Monsoon Maintenance Work At Ghats At Lamehtaghat
2026_UAD_502163_1
371/PWD/NP/2026
Open Tender
Miscellaneous Works
Lump-sum
15 days
Work
AS PER NT AND TENDER DOC
2 documents required · 2 mandatory
₹2,000
₹5,200
19 Aug 2026
13 May 2026
1 Jun 2026
13 May 2026
30 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work Name - Annual Per And Post Monsoon Maintenance Work At Ghats At Lamehtaghat | - | - | - | - |
| 2 | Dismanting, shifting and re installation of detachable steel sheds structures (at bhedaghat dhuadhar, lamhetaghat, panchwati ghat and saraswati ghat) detachable steel ralling (at Bhedaghat dhuadhar, panchwati ghat) sheds of boats (at panchwati ghat) detachable steel chairs, 08 changing room steels doors (at panchwati ghat and lamhetaghat), rolling shutters (at panchwati ghat) and steel entrance gate form/near ghats before monsoon season and re erection of the same (as it is after monsson inculing roofing sheets, removing and refixing foundation bolts, nuts, welding wherever requred alignment shifting all complete as per directed by Engineer in chargar.) 2. Dismanting, shifting (before monsson season) and re erection (after monsson) of exsting high mast lighting pole and 9 electricity poles at dhuadhar poles at dhuadhar bhedaghat including alignmnet and tightening of foundation bolts, shifting all complete as per directed by Engineer in charge. 3. Light, shifting (before monsoon season) and re-plancing (after monsson) detachable steel bridge structure at dhuadhar view pint using suitable machinery including alignment, refixing, shifting all complete as per directed by Engineer in Charge | - | Lumpsum | 4,00,000 | - |
| 3 | Removal of Deposited sand silt, mud and debris form saraswati ghat and panchwati ghat area and platforms areas after flood including removing landing trasportation and disposal of the same up to specified lead of upto 1 km as per directed by Engineer In Chagre. | - | CUM | 1,10,000 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
keydateaffidavite502163.pdf
Tender Documents • 0.46 MB
Estimate371.pdf
Other Document • 0.46 MB
BOQ_611179.xls
BOQ • 0.31 MB
FORMFa.pdf
Additional Documents • 0.22 MB
Condition.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].