| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹8.4 L+₹30,374.68 (3.76%)Rejected-Finance | L2 | Rejected-Finance L2 BIDDER |
Tender Value
₹16.8 L
EMD Value
₹33,800
Closing Date
12 Oct 2022, 2:00 pmClosed
EE ICD 3 LALITPUR
OFFICE OF EE ICD 3 LALITPUR
RESTORATION WORK OF BHADRA MINOR FROM HEAD TO TAIL OF CHOUDHARY CHARAN SINGH UPPER RAJGHAT CANAL
2022_UPIDC_734640_2
2022-23/EE/02
Open Tender
Civil Works - Canal
Item Rate
45 days
LALITPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹33,800
15 Nov 2022
6 Oct 2022
12 Oct 2022
6 Oct 2022
12 Oct 2022
6 Oct 2022
Amount
Jungle clearance by cutting heavy under growth and bushes upto 7.50 cm diameter i/c collection and removal with all cost of labour T&P etc, required for completion of work including all taxes but excluding GST
Laying C.C. 1:3:6 (M-10) in foundation by mechanical mixing, mechanical vibrating , curring with cost of all material , labour and T&P etc. required proper completion of work including all taxes but excluding GST
R.C.R. stone masonry in 1:4 mix with cement & sand including all cost of material, labour and T&P etc. required for proper completion of work including all taxes but excluding GST
Laying Cement Concrete 1:2:4 (M-15, A-20 grade ) By Mechanical mixing, Mechanical Vibrating , curing with all cost of material, labour and T&P etc. required for proper completion of work including all taxes but excluding GST
Cement pointing in 1:2 mix with cement & sand including all cost of material, labour and T&P etc. required, proper completion of work including all taxes but excluding GST
Laying R.C.C. 1:1.5:3 (M20) By Mechanical mixing, Mechanical Vibrating , curing with all cost of material, labour and T&P etc. required for proper completion of work including all taxes but excluding GST
Centering and Shuttering for R.C.C . work i/c all cost of material , Fabrication , erection , labour etc. required for proper completion of work with all taxes but excluding GST .
Centering and Shuttering for Plain C.C . work i/c all cost of material , Fabrication , erection , labour etc. required for proper completion of work with all taxes but excluding GST .
Steel reinforcement for Cement Concrete work i/c cutting, placing ,binding with GI wire with its cost , all labour material and T&P etc. required for proper completion of work but excluding GST
Supply & fixing of 110 mm diameter PVC pipe of 6 Kgf/cm2 for canal outlets including all cost of material, labour and T&P etc. required, with all taxes but excluding GST.
Excavation in Mar, Kaber, Ranker & Kanker mixed soil in bed with average disposal lead of 30 m & lift up to 1.5 m including making profile, dressing, manual compaction, labour and T&P etc. Required for proper completion of work including all taxes but excluding GST
E/w in M.K.R. & kanker mixed soil in filling with All lead & lift including dressing, making profile, labour and T&P etc. required for proper completion of work including all taxes but excluding GST
All weather painting of pucca strucutre by plastic paint apex 1st quality Nerolac/Berger/Asian or Equivalent including cost of Emulsion Labour , T&P Taxes etc. Required for proper completion of work but excluding GST
Painting and Lettering and chainaging on Pucca Structure with superior quality of Enamel paints i/c cost of all material, labour T&P etc. required for proper completion of work but excluding GST.
Hiring 1 No. Diesel Jeep/Diesel Car/Taxi with its driver and maintenance, including cost of diesel (Which is to paid @ of one liter/10 km.) as per I.D. S.O.R No. 1.43 (b). Vehicle should not be older than 5 years from the publishing date.
M/S TILAK SINGH YADAV
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .