| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.2 CrAdmitted-Finance | ₹82.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹86.3 Cr+₹4.0 Cr (4.90%)Admitted-Finance | ₹86.3 Cr+₹4.0 Cr (4.90%) | L2 | Admitted-Finance |
| 3 | L3₹87.5 Cr+₹5.3 Cr (6.46%)Admitted-Finance | ₹87.5 Cr+₹5.3 Cr (6.46%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHANTI CONSTRUCTION (GUJ) PVT. LTD. L2 | M/s Super Construction Co Nagpur L1 | D. V. Patel and Company L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. As directed by Engineer in charge. | 198.9 | Cu.M | 1,910 ₹3,79,899 | 1,880 ₹3,73,932 Lowest | 1,900 ₹3,77,910 |
| 2.00 | Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete. As directed by Engineer in charge. | 134 | Nos. | 195 ₹26,130 Lowest | 199 ₹26,666 | 200 ₹26,800 |
| 3.00 | Removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete. As directed by Engineer in charge. | 40 | Nos. | 155 ₹6,200 | 150 ₹6,000 Lowest | 160 ₹6,400 |
| 4.00 | Removing cement or lime plaster including disposing of the spoils as directed with all leads, lifts etc, complete. As directed by Engineer in charge. | 5,320.15 | Sq.M | 27 ₹1,43,644.05 | 25 ₹1,33,003.75 Lowest | 28 ₹1,48,964.2 |
| 5.00 | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. As directed by Engineer in charge. | 917.45 | Cu.M | 398 ₹3,65,145.1 Lowest | 400 ₹3,66,980 | 405 ₹3,71,567.25 |
| 6.00 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete. As directed by Engineer in charge. | 1,134.9 | Sq.M | 61 ₹69,228.9 | 60 ₹68,094 Lowest | 65 ₹73,768.5 |
| 7.00 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. As directed by Engineer in charge. | 56.75 | Cu.M | 1,900 ₹1,07,825 | 1,880 ₹1,06,690 Lowest | 1,910 ₹1,08,392.5 |
| 8.00 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. As directed by Engineer in charge. | 12.2 | Cu.M | 725 ₹8,845 | 700 ₹8,540 Lowest | 730 ₹8,906 |
| 9.00 | Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete. As directed by Engineer in charge. | 20 | Nos. | 234 ₹4,680 | 225 ₹4,500 Lowest | 230 ₹4,600 |
| 10.00 | Removing wash hand basins/urinals with frame including disconnecting the sanitary and water supply connections, removing the same carefully and stacking the serviceable materials as and where directed including throwing the unserviceable materials outside etc complete. As directed by Engineer in charge. | 22 | Nos. | 130 ₹2,860 | 125 ₹2,750 Lowest | 135 ₹2,970 |
Tender Value
₹78.0 Cr
EMD Value
₹39.0 L
Closing Date
29 Jun 2026, 5:00 pmClosed
Executive Engineer-I, Nagpur Board
Nagpur Housing and Area Development Board, Civil lines, Nagpur
CONSTRUCTION OF ADMINISTRATIVE OFFICE BUILDING AFTER DEMOLITION OF EXISTING ADMINISTRATIVE OFFICE BUILDING OF NAGPUR HOUSING AND AREA DEVELOPMENT BOARD, NAGPUR..
2026_MHADA_1303810_1
E--Tender Notice No.02 /NB/ EE-I/of 2026-27
Open Tender
Civil Works - Buildings
Item Rate
1095 days
Nagpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
₹39.0 L
MHADA Nagpur
17 Aug 2026
18 May 2026
30 Jun 2026
18 May 2026
29 Jun 2026
18 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. As directed by Engineer in charge. | 198.9 | Cu.M | - | - |
| 2 | Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete. As directed by Engineer in charge. | 134 | Nos. | - | - |
| 3 | Removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete. As directed by Engineer in charge. | 40 | Nos. | - | - |
| 4 | Removing cement or lime plaster including disposing of the spoils as directed with all leads, lifts etc, complete. As directed by Engineer in charge. | 5,320.15 | Sq.M | - | - |
| 5 | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. As directed by Engineer in charge. | 917.45 | Cu.M | - | - |
| 6 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete. As directed by Engineer in charge. | 1,134.9 | Sq.M | - | - |
| 7 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. As directed by Engineer in charge. | 56.75 | Cu.M | - | - |
| 8 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. As directed by Engineer in charge. | 12.2 | Cu.M | - | - |
| 9 | Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete. As directed by Engineer in charge. | 20 | Nos. | - | - |
| 10 | Removing wash hand basins/urinals with frame including disconnecting the sanitary and water supply connections, removing the same carefully and stacking the serviceable materials as and where directed including throwing the unserviceable materials outside etc complete. As directed by Engineer in charge. | 22 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Structural_Drawing.pdf
Additional Documents • 4.82 MB
BOQ_2238413.xls
BOQ • 1.06 MB
TenderDocument.pdf
Tender Documents • 2.64 MB
Architectural_Drawings.pdf
Additional Documents • 17.67 MB
DateIII.pdf
PDF • 0.01 MB
DateII.pdf
PDF • 0.01 MB
DateI.pdf
PDF • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .