Loading
Loading…
Loading…
Tender Value
₹2.6 L
EMD Value
₹5,200
Closing Date
10 Jul 2026, 10:30 am2d left
EE MGCCD8 BULANDSHAHR
EE MGCCD8 BULANDSHAHR
Construction of HPC at Km. 2.020 of Ganhot Minor
2026_UPIDC_1144439_40
01.EE.2026-27
Open Tender
Civil Works
45 days
sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹5,200
4 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc. | - | CUM | - | - |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 1 | CUM | - | - |
| 3 | Providing and Laying first class M-150 brick work in 1:4 Cement Mortar including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 1 | CUM | - | - |
| 4 | Providing and Laying R.C.C. M-20 (1:1:5:3) cement concrete including cost of all materials,, labour, T&P, all lifts and leads etc. complete. | - | CUM | - | - |
| 5 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all labour and T&P etc. | - | MT | - | - |
| 6 | Providing and fixing Centering & shuttering for R.C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | - | SQM | - | - |
| 7 | Providing and fixing Centering & shuttering for C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | 1 | SQM | - | - |
| 8 | providing and Laying 12 mm Thick Plaster in 1:4 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 1 | SQM | - | - |
| 9 | Laying Brick on edge on Road Laid Dry Joints including preparation of base to proper slope and its ramming inclucding cost all material labour, T&P etc. required for proper completion of work. | - | CUM | - | - |
| 10 | Providing and Laying 1200 mm dia C.C. pipe including all lift and leads with cost of All materials, Labour, T&P etc. required for Proper completed of work. | - | RM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_2187594.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid