Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.8 LAccepted-AOC 47 | BHOPAL | MADHYA PRADESH | 462001 | L-1 | Accepted-AOC Sanction due to rate is equivalent to old sanction rate | |
| 2 | L-2₹10.0 L+₹18,646.10 (1.90%)Rejected-Finance BEHIND R K S PURAM ARADHYA VATIKA PADAMPUR ROAD NEAR JADESHKHA DAM MURAR GWALIOR MADHYA PRADESH | GWALIOR | GWALIOR | MADHYA PRADESH | 474006 | L-2 | Rejected-Finance Due to higher rates are canceled. | |
| 3 | L-3₹10.2 L+₹37,908.60 (3.86%)Rejected-Finance MANAWAR ALIRAJPUR | ALIRAJPUR | MADHYA PRADESH | 457882 | L-3 | Rejected-Finance Due to higher rates are canceled. | |
| 4 | L-4₹10.5 L+₹71,810.60 (7.31%)Rejected-Finance | L-4 | Rejected-Finance Due to higher rates are canceled. | |
| 5 | L-5₹11.4 L+₹1.6 L (16.4%)Rejected-Finance | L-5 | Rejected-Finance Due to higher rates are canceled. |
Tender Value
₹15.4 L
EMD Value
₹30,820
Closing Date
27 Feb 2024, 5:30 pmClosed
eephed sardarpur
eephed sardarpur
Work For Installation Of Single Phase Motor Pump On Existing Tubewell For Drinking Water Supply Arrangements At Block Manawar District Dhar
2024_PHED_331359_1
Nit No. 25 /Pro Cell/EE/PHED/2023-24Sardarpur
Open Tender
Civil Works - Water Works
Percentage
90 days
Manawar
as per nit
3 documents required · 3 mandatory
₹2,000
₹30,820
22 Mar 2024
8 Feb 2024
29 Feb 2024
8 Feb 2024
27 Feb 2024
9 Feb 2024
8 Feb 2024 - 9 Feb 2024
eProcurement System Government of Madhya Pradesh Created By: MOHANLAL MAKWANE Created Date/Time: 07-Mar-2024 05:06 PM Tender Title: Work For Installation Of Single Phase Motor Pump Tender ID: 2024_PHED_331359_1
Tender Inviting Authority: Executive Engineer P.H.E Division Sardarpur
Name of Work: Work For Installation Of Single Phase Motor Pump On Existing Tubewell For Drinking Water Supply Arrangements
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 BHASKAR CONSTRUCTION(GSTN-23EOJPS8850D1ZN) 1541000.000 -31.550 1054814.500 Ten Lakh Fifty Four Thousand Eight Hundred and Fourteen
2.00 BALAJI CONSTRUCTION AND SUPLAYERS WEF 01 03 2013(GSTN-23APRPJ3258F1ZU) 1541000.000 -33.750 1020912.500 Ten Lakh Twenty Thousand Nine Hundred and Tweleve
3.00 HARSHITA ENTERPRISES(GSTN-NA) 1541000.000 -35.000 1001650.000 Ten Lakh One Thousand Six Hundred and Fifty
4.00 AKHIL ENTERPRISES(GSTN-NA) 1541000.000 -36.210 983003.900 Nine Lakh Eighty Three Thousand Three
5.00 LOTUS ELECTRIC CORPORATION(GSTN-NA) 1541000.000 -25.760 1144038.400 Eleven Lakh Fourty Four Thousand Thirty Eight
6.00 RAHUL JAISWAL ENTERPRISES(GSTN-NA) 1541000.000 -22.000 1201980.000 Tweleve Lakh One Thousand Nine Hundred and Eighty
Lowest Amount Quoted BY: AKHIL ENTERPRISES(983003.900)
BOQ Summary Details Tender Title: Work For Installation Of Single Phase Motor Pump Tender ID: 2024_PHED_331359_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 AKHIL ENTERPRISES 983003.900 L1
2 HARSHITA ENTERPRISES 1001650.000 L2
3 BALAJI CONSTRUCTION AND SUPLAYERS WEF 01 03 2013 1020912.500 L3
4 BHASKAR CONSTRUCTION 1054814.500 L4
5 LOTUS ELECTRIC CORPORATION 1144038.400 L5
6 RAHUL JAISWAL ENTERPRISES 1201980.000 L6
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .