| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹29.8 LAccepted-AOC S O MAKHAN SINGH | ₹29.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹30.4 LRejected-AOC | ₹30.4 L | 2 | Rejected-AOC L2 |
| 3 | 3₹31.6 LRejected-AOC | ₹31.6 L | 3 | Rejected-AOC L3 |
| 4 | 4₹33.8 LRejected-AOC ROPAR CANALS AND GROUND WATER MODEL JAL SAROT VIBHAG PUNJAB ROPAR | ₹33.8 L | 4 | Rejected-AOC L4 |
| 5 | 5₹35.2 LRejected-AOC NOT SPECIFIED | ₹35.2 L | 5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Singla Contractors L3 | VIRASAT GROUP L2 | SOKHAL CONTRACTOR L5 | GURPREET SINGH CONTRACTOR L1 | Deep Enterprises L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 1 | Cum | 81 ₹29,847.69 | 83 ₹30,584.67 | 100 ₹36,849 | 60 ₹22,109.40 | 85 ₹31,321.65 |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 1 | Cum | 115 ₹19,318.85 | 115 ₹19,318.85 | 135 ₹22,678.65 | 99 ₹16,631.01 | 120 ₹20,158.80 |
| 3.00 | Dressing of New Earthwork | 1 | Sq.Mtr | 1.2 ₹2,628 | 2 ₹4,380 | 2.5 ₹5,475 | 1.3 ₹2,847 | 2 ₹4,380 |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 1 | Cum | - | - | - | - | - |
| 5.00 | Re-handling of earthwork recently executed | 1 | Cum | 65 ₹23,951.85 | 65.5 ₹24,136.10 | 80 ₹29,479.20 | 60 ₹22,109.40 | 65 ₹23,951.85 |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 1 | km | 848 ₹3,103.68 | 850 ₹3,111 | 860 ₹3,147.60 | 848 ₹3,103.68 | 848 ₹3,103.68 |
| 7.00 | Dismantling Brick Work in Cement | 1 | Cum | - | - | - | - | - |
| 8.00 | Dressing of Bed and Preparation of Sub-grade for Lining | 1 | Sq.Mtr | 11 ₹16,654.44 | 12 ₹18,168.48 | 20 ₹30,280.80 | 11.35 ₹17,184.35 | 12 ₹18,168.48 |
| 9.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for foundation and plinth. | 1 | Cum | 6,600 ₹26.5 L | 6,301 ₹25.3 L | 7,250 ₹29.1 L | 6,250 ₹25.1 L | 7,050 ₹28.3 L |
| 10.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 1 | Sq.Mtr | 180 ₹2.2 L | 175 ₹2.1 L | 210 ₹2.6 L | 168.5 ₹2.1 L | 190 ₹2.3 L |
Updated dates
Tender Value
₹27 L
EMD Value
₹54,000
Closing Date
19 Mar 2026, 10:00 amClosed
Xen Fazilka Canal And Ground Water Division CC FZR
Xen Fazilka Canal And Ground Water Division CC FZR
Estimate for Lining of Watercourse of Outlet RD 48000/R of Jandwala Disty by Brick Masonry of Village Chaurian Wali Distt Fazilka
2026_WR_161504_2
028/FazilkaCanal/2025-26 dated 20/02/2026
Open Tender
Civil Works - Canal
45 days
Xen Fazilka Canal And Ground Water Division CC FZR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹54,000
11 May 2026
21 Feb 2026
19 Mar 2026
21 Feb 2026
19 Mar 2026
21 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer, Fazilka Canal & ground water Division, WRD Punjab, Ferozepur.
Name of Work:Estimate for Lining of Watercourse of Outlet RD 48000/R of Jandwala Disty by Brick Masonry of Village Chaurian Wali Distt Fazilka.
Contract No: 01632 292604
Name of the Bidder/ Bidding Firm / Company :
SR No. Item Description Item Code / Make Aprox. Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods t1 Cum Excess(+) Full Conversion INR
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. t2 Cum Excess(+) Full Conversion INR
Dressing of New Earthwork t3 Sq.Mtr Excess(+) Full Conversion INR
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. t4 Cum Excess(+) Full Conversion INR
Re-handling of earthwork recently executed t5 Cum Excess(+) Full Conversion INR
Dag belling single kassi stroke minimum 7.5 cm depth. t6 km Excess(+) Full Conversion INR
Dismantling Brick Work in Cement t7 Cum Excess(+) Full Conversion INR
Dressing of Bed and Preparation of Sub-grade for Lining t8 Sq.Mtr Excess(+) Full Conversion INR
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for foundation and plinth. t9 Cum Excess(+) Full Conversion INR
10 mm thick Cement Plaster 1:4 on Side Walls t10 Sq.Mtr Excess(+) Full Conversion INR
10 mm thick Cement Plaster 1:4 on Floors t11 Sq.Mtr Excess(+) Full Conversion INR
Providing & Laying Dry Brick Bats t12 Cum Excess(+) Full Conversion INR
Providing & Laying Brick Ballast t13 Cum Excess(+) Full Conversion INR
Supplying of RCC Shutter with One Extra Frame for Nakka and Branch Offtakes t14 Each Excess(+) Full Conversion INR
Fixing of Shutter and Frames for Nakka and Branch Offtakes t15 Each Excess(+) Full Conversion INR
Providing & laying Cement Concrete 1:6:12 t16 Cum Excess(+) Full Conversion INR
Providing,lowering,jointing & cutting of RCC pipes np2 400mm dia into trenches & laying same to correct alignment t17 Mtr Excess(+) Full Conversion INR
Any Other Item t18 No. Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
sbd_water_courses.pdf
Tender Documents • 19.06 MB
BOQ_327388.xls
BOQ • 0.26 MB