| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.3 L+₹3,850 (1.72%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹2.5 L
EMD Value
₹3,200
Closing Date
4 Mar 2025, 11:00 amClosed
GM,SSA
Office of the General Manager, Satgram-Sripur Area
Certification of Lancashire Boiler No WBL 8110 including cleaning, dismantling and repairing at Ningah Colliery under Satgram-Sripur Area
2025_ECL_329105_1
ECL/SSA/GM/E M/E-NIT/2024-25/175 Date 12.02.2025
Open Tender
Miscellaneous Works
Item Rate
30 days
Ningah Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,200
5 May 2025
18 Feb 2025
5 Mar 2025
18 Feb 2025
4 Mar 2025
18 Feb 2025
18 Feb 2025 - 22 Feb 2025
Amount
Item description
Cleaning of Lancashire boiler
During NDT of the boiler shell plate, it was noticed that the thickness near steam side surface of LHS 2nd, 3rd and 4th streak between 4 o'clocl to 6 o'clock position.The position where the thickness gauging was carried were built up by electric arc welding with pre-post heat treatment and dressed smooth to original shape and thickness
Supply and fitting of new IBR quality fusible plugs (02 nos) in original manner with IBR test certificates and approval from boiler inspector
Cutting out of old adaptors 2 nos, fabrication of two new adaptors from HT bar and then welding the same in the boiler
Staggered and isolated pitting were observed at 5 to 7 o'clock position of the boiler front end plate near mud hole during inspection. The position where the thickness gauging was carried are to be built up by electric arc welding with pre-post heat treatment and dressed smooth to original shape & thickness
All the adamson ring joints of the boiler are to be caulked
Overhauling of feed check valve including machining of valve seats and refabrication of valve spindle
Overhauling of main steam stop valve including thorough dismantling and refabrication of valve spindle and bush, machning of valve main seat and base seat for making it leakproof
Overhauling of gauge coloumn cocks and replacement of inner spares and refitting to boiler with new gauge glass , rubber cones and rings
Overhauling of blow down valve including high pressure test of the valve to withstand pressure of 2 times of boiler working pressure
The bottom manhole studs to be replaced with new one
Blanking of boiler for hydraulic test
Pressure test of boiler at 1.5 times of the working pressure in presence of Dy Director of Boilers,WB.After successful testing and certificate the boiler is to be commissioned for firing
Overhead profit
Statutory boiler dry and hydraulic inspection fees and arrangement of inspection by Dy. Director of Boilers,WB
Total impact of GST for the purpose of CTC
M/s Prasanta Karmakar (BID ID -1133121)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .