| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -40.10% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 LAdmitted-Finance | -35.89% | ₹1.2 L | L2 | Admitted-Finance |
| 3 | L3₹1.3 LAdmitted-Finance | -35.57% | ₹1.3 L | L3 | Admitted-Finance |
| 4 | L4₹1.3 LAdmitted-Finance NA | -34.00% | ₹1.3 L | L4 | Admitted-Finance |
| 5 | L5₹1.3 LAdmitted-Finance | -33.57% | ₹1.3 L | L5 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
13 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW JAMMU
OFFICE OF EXECUTIVE ENGINEER REW JAMMU
LAYING OF TILE WORK OF LANE FROM HOUSE OF SHRI ROMESH LAL TO HOUSE OF SATPAL WARD NO 3 VILLAGE DHALERI IN PANCHAYAT NARYANA UPPER, BLOCK KHOUR UNDER THE SCHEME CDF FOR THE YEAR 2025-26
2026_RDPR_301910_5
e-NIT No. 786 REWJ of 2025-26 dated 31-01-2026
Open Tender
Civil Works
JAMMU
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH0515
₹3,880
Yes
16 Feb 2026
31 Jan 2026
14 Feb 2026
31 Jan 2026
13 Feb 2026
31 Jan 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:ALL KINDS OF SOIL
P/L CEMENT CONCRETE OF 1 5 10 MIX EXCL THE COST OF CENTERING AND SHUTTERING ALL COMPLETE WITH 40MM NOMINAL AGGREGATES
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 MIX with 20mm nominal aggregates all complete.
Providing and laying in reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1.5:3 MIX with 20mm nominal aggregates all complete.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Cold twisted bars
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate.
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge.
CENTERING AND SHUTTERING INL PROPPING , REMOVAL OF FORMWORK.
SUSPENDED FLOOR
EDGES OF SLAB
SAND FOR 7KM
AGG FOR 7KM
ADD COST OF SIGN BOARD INCL WRITING, PAINTING COMPLETE JOB
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_979536.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid