Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical NO W 658 FIRST FLOOR 4TH AVENUE ANNA NAGAR WEST EXTENSION CHENNAI 600 101 | CHENNAI | CHENNAI | TAMIL NADU | 600101 | Accepted-Technical Acceptable |
| 2 | Accepted-Technical SECOND FLOOR 12 A OMAXE AVENUE OMAXE CITY ROAD BIJNORE ROAD LUCKNOW UTTAR PRADESH 226014 | LUCKNOW | UTTAR PRADESH | 226014 | Accepted-Technical Acceptable |
| 3 | Accepted-Technical RH1 2 PLOT NO 5 SECT 3 SHREE NITHYANAND CHS NEW PANVEL E NAVI MUMBAI 410206 MAHARASHTRA INDIA | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410206 | Accepted-Technical Acceptable |
| 4 | Rejected-Technical | Rejected-Technical Bidder has not submitted copy of work order and completion certificate issued by end user hence technically not acceptable. |
Tender Value
Refer Docs
EMD Value
₹13.3 L
Closing Date
12 Mar 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
VENKATESH
As per tender document
COMPOSITE WORKS FOR CONVERSION OF 18 INCH TMPL (TROMBAY MGL PIPELINE) NON-PIGGABLE TO PIGGABLE AND ASSOCIATED JOBS IN MUMBAI, MAHARASTRA
2026_GAIL_264040_1
GAIL/MU/CnP/OnM/25/C97
Open Tender
Civil Works
Works
730 days
As per tender document
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹13.3 L
Through teams meeting
13 Apr 2026
29 Jan 2026
13 Mar 2026
29 Jan 2026
12 Mar 2026
29 Jan 2026
6 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION-A (PIPELINE WORKS) | - | - | - | - |
| 2 | PIPELINE LAYING / INSTALLATION (CS PIPES) | - | - | - | - |
| 3 | Receiving and taking over, as defined in the specifications, handing, loading, transportation and unloading of Owner-supplied 3-layer PE coated line pipes, bare pipes along with associated fittings and valves from Owner's designated stock-yard to Contractor's stock-yard / workshop / work-site including preliminary activities, preparation of drawings, wherever required for crossing, etc. including handling, stacking, stringing on the pipeline right-of-use / pipeline route alignment, carrying out inspection of Company-supplied materials, including line pipes, at the time of taking over, laying / installation of coated line pipes, associated fittings (IJ,barred tee etc) and accessories, including execution of all works, taking over, handling, including loading and unloading, arrangement of all additional land required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner-supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline, as per drawings, specifications, other provisions of Contract Document and instructions of Engineer-in-Charge (EIC), including, but not limited to, carrying out following works: | - | - | - | - |
| 4 | Including marking the route map, alignment sheet, etc. drawings showing survey details, and submit same to Owner for review. | - | - | - | - |
| 5 | Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of concerned authorities, grading of work area. Shifting of all obstructions within the ROU / pipeline route alignment, viz. electrical lines / poles, telephone lines / poles, coordination with concerned authorities and obtaining permissions from these authorities. | - | - | - | - |
| 6 | Trenching to all depths and to a width to accommodate the pipeline and/or optical fibber cable/cable conduit during lowering & backfilling as specified in scope document and as per the relevant standards, specifications, etc by excavation in all types of soils (including soft/hard rock), including controlled blasting, chiselling or otherwise cutting etc.; providing depth of padding (Soft soil or sand) /rock shield (as directed by EIC) in trench bed & above and around the pipeline HDPE duct and OFC as required with sand / graded earth approved by Engineer-in Charge; [The minimum depth of the top of pipeline shall be 1.2m measured from top of pipeline coating to the top of undisturbed surface of the soil or as per Special Condition of Contract (SCC) / OSID - 141 OISD - 226]. Dewater of trenches if required as per site condition. | - | - | - | - |
| 7 | Carrying out repairs of pipe defects / replacement in new pipeline laid by contractor in case of pipe defects / deficiencies not attributable to Owner including defects / damages occurring during transportation / handling. | - | - | - | - |
| 8 | Stringing of line pipes along ROU including providing straw / sand / soft soil bags, soft padding / sand padding. | - | - | - | - |
| 9 | Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding & field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-Ray (in case of space constraint & small work by Gamma Ray on Owner's approval) as per specifications in piping of all types and thickness and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities & personnel to process, develop, examine and interpret radiographs & other tests as required, carrying out repairs of weld-joints found defective by EIC, carrying out re-radiography and other NDT tests (e.g. MPI, DP & additional UT for golden joints) as required on repaired joints, etc. as mentioned in SCC and particular job specifications. | - | - | - | - |
| 10 | Coating of all weld joints, short radius / long radius bends, etc. | - | - | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.91 MB
ITB.pdf
Tender Documents • 2.20 MB
sccsowtv.pdf
Other Document • 37.18 MB
BOQ_306322.xls
BOQ • 0.52 MB
CBA.xls
Additional Documents • 0.06 MB
CorrigendumCOMPOSITE.pdf
PDF • 11.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .