| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.2 LAccepted-Finance | ₹33.2 L | L1 | Accepted-Finance Qualify for Transparent lottery |
| 2 | L1₹33.2 LAccepted-Finance | ₹33.2 L | L1 | Accepted-Finance Qualify for Transparent lottery |
| 3 | L1₹33.2 LAccepted-Finance AT DIAJODI P O BALA PS KARANJIA DIST MAYURBHANJ | BALESHWAR | ODISHA | 756028 | ₹33.2 L | L1 | Accepted-Finance Qualify for Transparent lottery |
| 4 | L1₹33.2 LAccepted-Finance | ₹33.2 L | L1 | Accepted-Finance Qualify for Transparent lottery |
| 5 | L1₹33.2 LAccepted-Finance | ₹33.2 L | L1 | Accepted-Finance Qualify for Transparent lottery |
Tender Value
Refer Docs
EMD Value
₹33,492
Closing Date
14 Aug 2026, 5:30 pmClosed
PA ITDA KARANJIA
ITDA , KARANJIA , DIST-MAYURBHANJ
Construction of 2 Nos. Staff Quarters at Mata Ashram School (Ground Floor) under Karanjia Bloock.
2026_STSCD_137462_13
03/2026-27
Open Tender
Civil Works - Buildings
Percentage
Mata
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹33,492
Yes
24 Aug 2026
31 Jul 2026
17 Aug 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches and column foundation and pits in hard soil/ gravelly soil and depositing materials with all leads, lifts and delifts including rough dressing the foundation bed as per specification including all cost of all labour, sundries, Tools & plants etc. complete as per the direction of Engineer-in-charge. | - | Cum | 1 | - |
| 2 | Filling in foundation and plinth with sand Watrering and ramming etc., complete including cost, conveyance, royality and all labour with T&P required for the work etc., complete in all respect as per the direction of Engineer-in-charge . | 1 | Cum | 1 | ₹1 |
| 3 | Cement Concrete (1:4:8) in foundation and plinth using 4cm (11/2”) size clean hard black broken granite metal of approved quality and from approved quarry free from weathered skin surface and other deletorious materials with sharp sand of approved quality and grading including hoisting lowering and laying concrete in layers not exceeding 15cm (6") thick to the required level ramming, watering and curing etc., complete with all cost and conveyance of all materials with all taxes and royalties with all labour and T&P required for the work etc., complete in all respect as per the direction of Engineer-in-charge. | 1 | Cum | 1 | ₹1 |
| 4 | Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strengtth not less than 75Kg/ Cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Foundation & Plinth to the required level watering and curing etc., complete including cost and conveyance of all materials all taxes and royalities and all labour with T&P required for the work etc., complete in all respect as per the direction of Engineer-in-charge.- Ground Floor | - | Cum | - | - |
| 5 | Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strengtth not less than 75Kg/ Cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in superstructure to the required level watering and curing etc., complete including cost and conveyance of all materials all taxes and royalities and all labour with T&P required for the work etc., complete in all respect as per the direction of Engineer-in-charge.- | 1 | Cum | 1 | ₹1 |
| 6 | RCC Work M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips approved quality and from approved quarry free fg in appropriate propertion, lowering, laying & compacting to proper level curing etc., complete as per direction of Engineer-in-charge.- (a) Col Base & Plinth Bend | 1 | Cum | - | - |
| 7 | (b) RCC-M-20 Lintel | 1 | Cum | 1 | ₹1 |
| 8 | (C) RCC-M-20 Col & Room Beam | - | Cum | - | - |
| 9 | (C) RCC-M-20 Chajja | 1 | Sqmt | 1 | ₹1 |
| 10 | (D) RCC-M-20 Roof Slab | - | Cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_603962.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
13DTCN.pdf
Tender Documents • 0.54 MB
BOQ_603962.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .