Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L1 | Accepted-AOC Award |
| Sl No | Description | Qty | Unit | SHRI MEENATCHI ENGINEERING L1 |
|---|---|---|---|---|
| 1.00 | Erection of Y PH Inter connected Transformer: Labour Charges for erection of ICT with turrets all HV/IV/LV Bushings,cable terminatio box, cooler bank A frame, Fans,pumps,Oil pipe lines, Marshalling Box, Cooler control cubicle, RTCC Panel and all accessories which ever is necessary for succesful commisioning of the transformer including Crane charges | 1 | Unit | 60,700 ₹60,700 Lowest |
| 2.00 | Hot Oil Circulation: Labour charges for Oil filling per Ltr excess Qty more than 800 Ltrs thorugh filter machine | 12,000 | Ltr. | 0.77 ₹9,240 Lowest |
| 3.00 | Hot Oil Circulation: Labour charges for Hot oil circulation &filteration upto satisfactory value is achieved including provision of suitable filter machine of appropiate capacity with 10/12 KL Filter machine above 50 MVA with minimum 50 Mts supply cable. | 30,682 | Ltr. | 1.92 ₹58,909.44 Lowest |
| 4.00 | Hot Oil Circulation:Provision of 20/40 KL Spare tanker for ICT including Transportation loading/unloading crane charges. | 1 | Unit | 24,500 ₹24,500 Lowest |
| 5.00 | Cable Laying & Termination: Labour charges for laying of control cables in trench/duct including bunching ,Alu tag indication upto 8 core. | 0.55 | KM | 19,100 ₹10,505 Lowest |
| 6.00 | Cable Laying & Termination:Labour charges for laying of control cables in trench/duct including bunching ,Alu tag indication above 8 core. | 0.42 | KM | 12,200 ₹5,124 Lowest |
| 7.00 | Cable Laying & Termination:Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours :19 mm | 36 | E | 87 ₹3,132 Lowest |
| 8.00 | Cable Laying & Termination:Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours :25 mm | 4 | E | 18 ₹72 Lowest |
| 9.00 | Cable Laying & Termination:Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours: 28 mm | 4 | E | 116 ₹464 Lowest |
| 10.00 | Cable Laying & Termination:Supplying and glanding including drilling suitable holes wherever necessary, peeling of insulation sleeves and cutting off armours: 32 mm | 14 | E | 135 ₹1,890 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,600
Closing Date
14 Oct 2025, 2:00 pmClosed
SE/GCC I/Chennai
SE GCC I,Guindy Chennai 32
Erection of Power Transformer
2025_EB_612424_1
LT.MM.(W)-03/2025-26 of SE/GCC I
Limited
Electrical Works
Item Rate
30 days
Guindy, Chennai-32
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,600
Yes
13 Nov 2025
8 Oct 2025
15 Oct 2025
8 Oct 2025
14 Oct 2025
8 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .