Loading…
Loading…
Tender ID
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
27 Jan 2026, 6:00 pmClosed
Executive Engineer
XEN RMC Dn.-II CAD Anta
Repair and Resotration work of Jarawadiya minor 0 to 4 km damage due to Heavy Flood.
2026_CADKO_528923_3
E-Nit 18 of 2025-26 RMC-II Anta
Open Tender
Civil Works
Percentage
30 days
jarawdiya
Repair and Resotration work of Jarawadiya minor 0 to 4 km damage due to Heavy Flood.
2 documents required · 2 mandatory
₹200
XEN RMC Dn.-II CAD Anta
₹4,800
Yes
24 Jan 2026
24 Jan 2026
28 Jan 2026
24 Jan 2026
27 Jan 2026
24 Jan 2026
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b) Hard soil
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto (d) 20 mm
Side shuttering including propping etc. complete (to achieve finish F 2 for :(A) Block joints of foundation stilling basins buckets, aprons etc. (non - suspended horizontally laid mass concrete)
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: (a) 75mm
Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. NP-3 . Including Labour charges (b) 150mm
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.(a) With initial lead of 250 m , (17a) Deduct in item no 16 (a) to (d) above if Standard Proctor's density to be achived is at least 95%
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
Tendernotice_2.pdf
PDF • 0.35 MB
BOQ_946395.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .