Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.2 L+₹3,960.23 (0.77%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹5.3 L+₹12,682.07 (2.46%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹5.4 L+₹19,528.84 (3.78%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹5.4 L+₹20,384.68 (3.95%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.8 L
EMD Value
₹16,000
Closing Date
20 Jul 2026, 4:00 pmClosed
Executive Engineer RnB Division Kupwara
Executive Engineer RnB Division Sulkote Kupwara
Construction of link road Miryane Via house of Amanullah Khan and Others Ward 4
2026_PWDJK_315701_3
NIT No. 25 of 2026-27 of RnB Division Kupwara
Open Tender
Civil Works
Item Rate
21 days
Mirwayan
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer RnB Division Kupwara
₹16,000
22 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil : 25 meter beyond 1 m
from cutting edge | 180 | cum | 479.3 | ₹86,274 |
| 2 | Providing & Laying of dry stone soling (Nallah)dully hand packed in foundation trenches consolidated & ramming as per specification including all carriages etc complete job | 18 | cum | 900 | ₹16,200 |
| 3 | Providing/ laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8 (1 cement:4 coarse aggregate:8 graded stone aggregates 40mm nominal Size) | 12 | cum | 5,202.9 | ₹62,434.8 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 60 | cum | 6,591.25 | ₹3,95,475 |
| 5 | Centering shuttering incl. straightening and removal of form work for foundation | 288 | sqm | 286.35 | ₹82,468.8 |
| 6 | Carriage of materials by mechanical transport from source upto site of work including loading, unloading and stacking a) sand for an lead of 30km | 33.84 | cum | 548.19 | ₹18,550.75 |
| 7 | Aggrgrates for an lead of 10 km | 64.08 | cum | 303.34 | ₹19,438.03 |
| 8 | Providinga and laying Back fiiling with Nallah muck | 108 | cum | 900 | ₹97,200 |
stage.html
html • 0.04 MB
finance_1025118.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_1025118.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .