| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC L1Financial Eligible | |
| 2 | L2₹8.3 L+₹7,236.82 (0.88%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | VIJAYENDRAN M L2 | SuruliRajan.T L1 |
|---|---|---|---|---|---|
| 1.001. Renovation of PUM School Building Karuppukilar North Facing in Karuppukilar Panchayat. | |||||
| 2.00 | Dismantaling of Ceiling Plastering Including all labour Charges and removing depris from the work site etc, complete.,… | 5.7 | sqm | 8.47 ₹48.28 | 8.4 ₹47.88 Lowest |
| 3.00 | Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,… | 64.46 | sqm | 8.47 ₹545.98 | 8.4 ₹541.46 Lowest |
| 4.00 | Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. | 5.7 | sqm | 316.63 ₹1,804.79 | 316.6 ₹1,804.62 Lowest |
| 5.00 | Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 44.2 | sqm | 348.52 ₹15,404.58 | 348.5 ₹15,403.7 Lowest |
| 6.00 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 11.48 | sqm | 278.6 ₹3,198.33 Lowest | 278.6 ₹3,198.33 Lowest |
| 7.00 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 52.99 | sqm | 1,624.95 ₹86,106.1 | 1,624.9 ₹86,103.45 Lowest |
| 8.00 | Provision for New Door fixing including all cost of convenyence,. and all labour charges etccomplete,. | 1 | LS | 1,500 ₹1,500 Lowest | 1,500 ₹1,500 Lowest |
| 9.00 | Repair to Windowincluding all cost of convenyence,. and all labour charges etccomplete,. | 2 | LS | 1,000 ₹2,000 | 500 ₹1,000 Lowest |
| 10.00 | Repair to Window Single Leaf including all cost of convenyence,. and all labour charges etccomplete,. | 2 | Ls | 2,659 ₹5,318 Lowest | 2,659 ₹5,318 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,305
Closing Date
16 Jul 2025, 3:00 pmClosed
Block Development Officer(B.pt),Kottur Block.
Block Development Officer(B.pt),Kottur Block.
1. Renovation of PUM School Building Karuppukilar North Facing in Karuppukilar Panchayat, 2. Renovation of PUE School Building South Facing Karuppukilar in Karuppukilar Panchayat, 3. Renovation of PUE School Building Kaduvakudi South Facing
2025_RDTN_579480_1
RC No1518 2025a2 07072025 SIUS 25 26 Kottur block Karuppukilar pt P7
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kottur Block
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹8,305
Yes
4 Sept 2025
8 Jul 2025
16 Jul 2025
8 Jul 2025
16 Jul 2025
8 Jul 2025
Amount
1. Renovation of PUM School Building Karuppukilar North Facing in Karuppukilar Panchayat.
Dismantaling of Ceiling Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers.
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Provision for New Door fixing including all cost of convenyence,. and all labour charges etccomplete,.
Repair to Windowincluding all cost of convenyence,. and all labour charges etccomplete,.
Repair to Window Single Leaf including all cost of convenyence,. and all labour charges etccomplete,.
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta
Black BoardPainting
Electrical Work :
Tube light Fitting
Ceiling Fan
Provision for Teacher Cubboard:
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Provision for Students Cubboard:
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Cheppal Rack :
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Drinking arrangements :-
Dismantling the Existing Damaged cement Plastering including all chages etc for complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,
Collection and supply of sand and filling in to the basement including cost and
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Provision for PVC Pipe,Tank and Tap arrangements
Painting ( Picture Painting for School building ) with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta ( BALA Painting)
Provision for Ramp Repair Work
Provision for White Board
Provision for Springs
Provision for Name board
2. Renovation of PUE School Building South Facing Karuppukilar in Karuppukilar Panchayat.
Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Repair to door including all cost of convenyence,. and all labour charges etccomplete,.
Repair to Window including all cost of convenyence,. and all labour charges etccomplete,.
Dismantaling of Damaged Pressed Tiles Including all labour Charges and removing depris from the work site etc, complete.,…
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta
Provision for White Board
Black BoardPainting
Provision for Teacher Cubboard:
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Provision for Students Cubboard:
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Cheppal Rack :
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Drinking arrangements :-
Dismantling the Existing Damaged cement Plastering including all chages etc for complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,
Collection and supply of sand and filling in to the basement including cost and
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Provision for PVC Pipe,Tank and Tap arrangements
Painting ( Picture Painting for School building ) with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta ( BALA Painting)
Provision for Springs
Provision for Name board
3. Renovation of PUE School Building Kaduvakudi South Facing in Karuppukilar Panchayat.
Dismantaling of ceiling Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers.
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Repair to door including all cost of convenyence,. and all labour charges etccomplete,.
Repair to Window including all cost of convenyence,. and all labour charges etccomplete,. (6 Nos)
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta
Black BoardPainting
Electrical Work :
Tube light Fitting
Ceiling Fan
Provision for Teacher Cubboard:
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Provision for Students Cubboard:
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Cheppal Rack :
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Drinking arrangements :-
Dismantling the Existing Damaged cement Plastering including all chages etc for complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,
Collection and supply of sand and filling in to the basement including cost and
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Provision for PVC Pipe,Tank and Tap arrangements
Painting ( Picture Painting for School building ) with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta ( BALA Painting)
Provision for White Board
Provision for Springs
Provision for Name board
4.Repairs to PUM School Toilet (West Face) @ Karuppukilar in Karuppukilar Panchayat.
Dismantling the Existing Damaged cement Plastering including all chages etc for complete
Dismantling the Existing Damaged cement Plastering including all chages etc for complete
Plastering with cm 1:5mix 12mm thick including cost,conveyance and all other labour charges etc
Plastering with cm 1:3 mix 12mm thick including cost,conveyance and all other labour charges etc
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old iron works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta
Provision for Water Supply arrangement
Provision for Septic Tank Cleaning
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
VIJAYENDRAN M (BID ID -1400827)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .