| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.8 CrAccepted-Finance | ₹1.8 Cr | L-1 | Accepted-Finance Being Lowest |
| 2 | L-2₹1.8 Cr+₹10,119.91 (0.05%)Rejected-Finance R O VILLAGE P O CHARATGARH TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹1.8 Cr+₹10,119.91 (0.05%) | L-2 | Rejected-Finance Not Lowest |
| 3 | L-3₹2.1 Cr+₹27.7 L (15.0%)Rejected-Finance VILLAGE PO DEHLAN TEHSIL DISTRICT UNA HP 601131 | UNA | UNA | HP | 601131 | ₹2.1 Cr+₹27.7 L (15.0%) | L-3 | Rejected-Finance Not Lowest |
| 4 | L-4₹2.3 Cr+₹42.9 L (23.2%)Rejected-Finance VILLAGE PO BADOH SUB TEHSIL GAGRET AT KALOH TEHSIL GHANARI DISTRICT UNA HP 601987 | UNA | UNA | HP | 601987 | ₹2.3 Cr+₹42.9 L (23.2%) | L-4 | Rejected-Finance Not Lowest |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
Tender Value
₹2.5 Cr
EMD Value
₹2.9 L
Closing Date
4 Jul 2026, 10:30 amClosed
Executive Engineer Haroli Division HPPWD Haroli
Executive Engineer Haroli Division HPPWD Haroli
Improvement of Una Rampur Haroli Jaijon road from Rampur Chowk to Jal Shakti Vibhag Rest House, named as Vikas Path km. 1/700 to 5/700 SH C/O Retaining walls, RCC and Metal crash Barrier, P/L Cobble stones and 80mm thick NTC Paver in footpath, P/F Ca
2026_PWD_137328_1
job1Improvement of Una Rampur Haroli Jaijon road from Rampur Chowk to Jal Shakti Vibhag Rest House,
Open Tender
Civil Works
Percentage
Haroli
Please refer to bidding document
22 documents required · 22 mandatory
₹7,000
₹2.9 L
14 Jul 2026
28 Jun 2026
4 Jul 2026
28 Jun 2026
4 Jul 2026
28 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto any height including getting out the excavated soil and disposal of surplus excavated soil as directed, within any all kind of soil including entire carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 1,103.5 | Per cubic metre | 191.25 | ₹2,11,044.38 |
| 2 | Providing and laying cement concrete 1:4:8 (one cement: four sand:eight graded crushed stone aggregate 40mm( forty millimeter nominal size) mechanically mixed and curing complete including cost of form work in foundation and plinth in all heights / depths including enitre carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 1,710.5 | Per cubic metre | 4,496.55 | ₹76,91,348.78 |
| 3 | Providing weepholes in brick masonry/ stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100mm(hundred milimetre)dia PVC pipe extending through the full width of the structures with slope of 1(v):20(H)(one vertical twenty horzontial) towards drawing face complete as per drawings and technical specification clause 614,709,1204.3.7 including carriage of material with in all leads and lifts and other incidentals.The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 988 | Each | 261.2 | ₹2,58,065.6 |
| 4 | Providing & laying cobbel stone 75 mm (Seventy five millimetre) thickness of specific shade & partern of make NTC or its equivalend in footpath of road including enitre carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 1,980 | Per square metre | 3,666.85 | ₹72,60,363 |
| 5 | Providing and laying 60mm (sixty millimetre) thick M-40 ( M- Forty) grade heavy duty precast cement concrete interlocking paver blocks of NTC make of any coloured over sand as per table 1500.5 and MORD 2014 technical specification of section1500 of clause 1504 ,including carriage of material within all leads and lifts and other incidentials.The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1,980 | Per square metre | 1,094.5 | ₹21,67,110 |
| 6 | Providing and laying (M-25) (M-twenty five) Grade Design Mix mechanically mixed and vibrated concrete for reinforced cement concrete in foundation upto all depth/heights for all type structure complete of reinforced cement concrete standard concrete design mix of with cement contents not less than 400kg.(four hundred kilogram) per cubic metre complete as required at site which may arise for all heights/ depths including the cost of form work with steel plates as per drawings and technical specification MORD 2014 Clause 802,803,1202,1203 as per the direction of the Engineer-in- chargeincluding carriage of material with in all leads and lifts and other incidentals .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 82.5 | Per cubic metre | 6,546.15 | ₹5,40,057.38 |
| 7 | Providing and laying tor steel (Sail/RINL/Shyam steel Tisco, Jindal make) reinforcement for reinforced cement concrete work including ,bending, binding,straightening and placing in position complete in all floor level/ heights including cost of binding wire complete including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,sale tax ,GST,labour cess or other taxes imposed by the Government. | 9,000 | Per Kilogramme | 95.8 | ₹8,62,200 |
| 8 | Providing and erecting a "W" metal beam crash barrier comprising of 3 mm ( Three millimetre) thick corrugated sheet metal beam rail, 70 cm ( Seventy centimetre) above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm ( One hundred fifty into seventy five into five millimetre) spaced 2 m ( Two metre) centre to centre, 1.8 m ( One point eight metre) high, 1.1 m ( One point one) below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm ( One hundred fifty into seventy five into five millimetre) , 330 mm ( Three millimetre) long complete as per MORD technical specification -2014 section 800 of clause 810 including carraige of materials within all leads and other incidentals.The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 150 | Per Running metre | 3,823.6 | ₹5,73,540 |
| 9 | Supply, installation, testing and commissioning of Solar LED Post Top Luminaire complete with integrated solar photovoltaic module. LED luminaire, battery, charge controller, mounting arrangement and all accessories. The luminaire shall provide a minimum lumen output of 2.880 efficacy of minimum 120 Im/W. The system shall be provided with a solar PV module, LiFePO, battery of minimum 12 AH capacity, and an intelligent charge controller with protection against overcharging, deep discharge, reverse polarity and short circuit. The luminaire shall provide automatic dusk-to-dawn operation and deliver minimum 10 hours of operation per night under standard operating conditions. The luminaire shall be suitable for installation on poles of 3-4 m mounting height, and shall have a minimum ingress protection rating of IP65. The housing shail be corrosion-resistant and suitable for outdoor applications. The complete system shall be supplied with a minimum two year comprehensive warranty including PCB, DC battery connections and any other activity that may be required for the proper functioning of the system Luxmax SPT 24 complete including carraige of materials within all leads and other incidentals.The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 40 | Each | 26,895 | ₹10,75,800 |
| 10 | Providing and fixing cat eye (Solar Powered) make ( 3M) of size 100x20mm (one hundred into one hundred twenty millimetre) made of heavy duty body shall be molded dual shank ASA /Acyclic styrene acyloretrite ) or HP/High impact polystyrene) ort ABS having electronically welded micro prismatic lens with abrasion resistant coating as approved by Engineer-in-charge. The road stud shall support a load of 13635 by tested in accordance with ASTM D4280.The slope of retro reflective surface shall be 35+/-5 degrees to base. The reflective panels on both side with at least 12cm ( Twelve centimetre) of each area side. The luminance intensity should be as per the specification ASTM as recommended in BS-8873 part 4 1973 as per approved sample and manufacture by the Engineer-in-charge including carriage of materail within all leads and lifts. The rates are inclusive of octroi, royality, Malkana, toll tax, GST , sale tax or other taxes imposed by the Government. | 150 | Each | 1,595.5 | ₹2,39,325 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_203241.xls
BOQ • 0.28 MB
sbd.pdf
Tender Documents • 6.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .