Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-AOC 85 PANNADI KATTUVALAVU THOTTILPATTY SALEM CAMP METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹2.3 L Quoted ₹2.2 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | aarthiconstruction L1 |
|---|---|---|---|---|
| 1.00 | Charges for cleaning the entire boiler structures, Buck stay beams, cable trays, walkways, staircase, handrail pipes, Burner corners, pipelines of various systems, PRDS system etc. free from fly ash, coal powder deposit etc. by using the Service air after the overhaul works of Boiler, including APH floors and Hot PA and SA ducts inside the boiler house including cleaning & Water washing the boiler ground floor area after overhauling of Boiler | 1 | Time | 2,00,000 ₹2 L |
| 2.00 | Charges for removal of all solid waste like cotton/wool waste, insulating materials, welding rod cut bits, spillage of oil etc. from boiler 0 mtr. to 52 mtr. floor areas and devolution of metal scrap to central stores/MTPS-I. (Lorry will be provided by board at free of cost) | 1 | Time | 15,000 ₹15,000 |
| 3.00 | T&P and consumables | 1 | LS | 2,500 ₹2,500 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
26 Nov 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit II Boiler Pressure Parts AOH 2025 Cleaning of boiler structures from 0 to 52 m Level etc
2025_EB_622698_1
CE / MTPS-I / SE / M-I / BM /OT. 345 / 2025-26
Open Tender
Power/Energy Projects/Products
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,000
Yes
29 May 2026
12 Nov 2025
27 Nov 2025
12 Nov 2025
26 Nov 2025
12 Nov 2025
Amount
Charges for cleaning the entire boiler structures, Buck stay beams, cable trays, walkways, staircase, handrail pipes, Burner corners, pipelines of various systems, PRDS system etc. free from fly ash, coal powder deposit etc. by using the Service air after the overhaul works of Boiler, including APH floors and Hot PA and SA ducts inside the boiler house including cleaning & Water washing the boiler ground floor area after overhauling of Boiler
Charges for removal of all solid waste like cotton/wool waste, insulating materials, welding rod cut bits, spillage of oil etc. from boiler 0 mtr. to 52 mtr. floor areas and devolution of metal scrap to central stores/MTPS-I. (Lorry will be provided by board at free of cost)
T&P and consumables
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_744626.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid