Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.8 LAccepted-Finance | ₹73.8 L | L1 | Accepted-Finance Responsive documents Submitted |
| 2 | L2₹73.9 L+₹3,228.38 (0.04%)Accepted-Finance | ₹73.9 L+₹3,228.38 (0.04%) | L2 | Accepted-Finance Responsive documents Submitted |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
16 Jan 2023, 11:00 amClosed
Executive Engineer-II
IMC office, opposite energy park, Niti Vihar, itanagar
1 CO protection wall 2 Flood protection wall 3 Rwall 4 Rwall 5 Rwall 6 Protection Wall 7 RCC protection wall 8 RCC wall 9 Rwall
2023_IMCAP_1027_1
IMC/EE(Pt-II)/15 FC/RFP/NIT-251/22-23/20
Open Tender
Civil Works
Item Rate
90 days
Naharlagun Ward no. 16
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
Payable To EE-II, IMC
₹1.5 L
Yes
31 Jan 2023
11 Jan 2023
17 Jan 2023
11 Jan 2023
16 Jan 2023
11 Jan 2023
11 Jan 2023 - 13 Jan 2023
Amount
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
PProviding and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for : b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
PProviding and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for : b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
PProviding and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for : b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
PProviding and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for : b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
PProviding and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for : b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
PProviding and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for : b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
PProviding and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for : b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
PProviding and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in: a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for : b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
PProviding and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in: a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for : b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
M/S T. C. ENTERPRISE
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1137.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .