| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,220
Closing Date
25 Feb 2025, 6:00 pmClosed
The Executive Engineer Civil Tender KTK Circle
Room No 324 3rd Floor CGMT Doorasamparka Bhavan No 1 Swamy Vivekananda Road Bengaluru 560008
Construction of culvert for rain water drain at main road entrance of TE building Kundapura Udupi
2025_BSNL_225553_1
18NITBSNLCDMYS202425
Open Tender
Civil Works - Buildings
Item Rate
60 days
UDUPI
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
BSNL MYSORE TELECOM DIST
₹3,220
1 Mar 2025
3 Feb 2025
28 Feb 2025
14 Feb 2025
25 Feb 2025
15 Feb 2025
14 Feb 2025 - 24 Feb 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
a) All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing :
a) 1:1½:3 (1 cement : 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for :
a) Suspended floors, roofs, landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
a) Thermo-Mechanically Treated bars of grade Fe-500D or more.
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with :
a) Cement mortar 1:6 (1 cement : 6 coarse sand).
Removing debries such as broken RCC slab, un usable stones, sludges etc accumulated near proposed drain by mechnical coveyance and dumping in dumping yards in cluding all lead and lifts and as directed by Engineer In Charge complete.
Removing stone slabs of various sizes laid over the path way which are disturbed due to scouring of sand beneath and relaying by levelling the surface using sand etc complete and as directed by Engineer In Charge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .