Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 LAccepted-AOC A PO KULUMA P S RENGALI DAM SITE DIST ANGUL PIN 759105 | KULUMA | ANGUL | ODISHA | 759105 | ₹25.8 L | L1 | Accepted-AOC Lottery winner |
| 2 | L1₹25.8 LRejected-AOC | ₹25.8 L | L1 | Rejected-AOC Lottery looser |
| 3 | L1₹25.8 LRejected-AOC | ₹25.8 L | L1 | Rejected-AOC Lottery looser |
| 4 | L1₹25.8 LRejected-AOC A PO PAIKSA SAHI TALCHER TOWN DIST ANGUL ODISHA 759107 | TALCHER TOWN | ANGUL | ODISHA | 759107 | ₹25.8 L | L1 | Rejected-AOC Lottery looser |
| 5 | L1₹25.8 LRejected-AOC AT SATRUSHOLA PO HUMMA PS RAMBHA DIST GANJAM ODISHA PIN 761027 | HUMMA | GANJAM | ODISHA | 761027 | ₹25.8 L | L1 | Rejected-AOC Lottery looser |
Tender Value
₹30.3 L
EMD Value
₹30,300
Closing Date
29 Dec 2025, 5:00 pmClosed
Superintending Engineer Angul R and B Division
O/O the Superintending Engineer Angul RB Division
Construction of deep drain at ch 0/0 to 0/100 km RHS and 0/460 to 0/560 km LHS of defunct NH-23.
2025_EICCL_123134_2
SE (R and B) Angul-45/ 2025-26
Open Tender
Civil Works - Roads
60 days
ANGUL
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹30,300
Yes
4 Apr 2026
12 Dec 2025
30 Dec 2025
12 Dec 2025
29 Dec 2025
12 Dec 2025
PART-A (CIVIL WORKS) Dismanting of prestressed / reinforced cement concrete grade M-20 and above incluidng T&P. & scaffolding where ever necessary sorting the dismantled materials disposal of unserviceable materials and stacking the serviceable materials with all lifts & lead of 1000m. with all labour, T&P. machineries etc. including labour cess but excluding GST complete as per specification & direction of the Engineer-in-charge
Earth work excavation in foundation and trenches in all kinds of soil including moorum stoney earth and earth mixed with boulder except sheet rock and boulders requiring blasting including rough dressing and levelling the bed up to the required depth & breaking clods to maximum 5cm to 7cm & depositing the excavated materials with all leads and lifts T&P shoring and shuttering if required including basic cost of all labour, T&P. as required for the work etc. including labour cess but excluding GST complete as directed by the Engineer-in-charge
Supplying and filling foundation and plinth with sand well watered and rammed with basic cost, conveyance, royalities of all materials including labour cess but excluding GST complete
PCC M-15 in foundation and floor i;e below the base course of terrazo flooring using 20 mm and down graded size black hard granite crusher broken aggregates of approved quality and from approved quarry, including lowering, laying concrete, watering curing etc. complete to required level laid in layers not exceeding 1'-6" thick including basic cost, conveyance, royalities of all materials and cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge
RCC M20 having compressive strength of 20mpa, target mean strength of 30mpa, for150mm cubes at 28 days curing as per IS-456-2000 & I.R.C-212000 test conducted in accordance with I.S. 516 using 20mm & down graded size crusher broken hard granite coarse aggregate of approved quality and from approved quarry & other materials as per section 302 of I.R.C.21-2000 & IS-456-2000 of approved quality including centering, shuttering & form works for providing smooth & water tight surface, hoisting, lowering & laying concrete in layers not exceeding 30 cm. compacted thickness, compacting with mechanical vibrators true to lines, grades as per drawing & technical specifications, watering & curing for 28 days including basic cost, conveyance, royalties of all materials with all leads & lift, cost of all labour T&P, including labour cess but excluding GST & equipment required for mixing, transporting & placing in position vibrating, compacting, finishing & curing including all incidental expenses complete in all respect as per direction of the E.I.C. but excluding the cost of M.S. rods or Tor steel and binding wire & labour charges for bending binding & tying the grills Raft
Supplying, cutting, straightening the bent up M.S. Rods or Tor steel, using SAIL / TATA / RINL / JINDAL STEEL / SHYAM STEEL (grade Fe 5OOD} etc. including bending, binding, welding jointing if necessary and tying the grills and placing in position as required for R.C.C. works and for providing required no of fan hooks hoisting, lowering, laying including basic cost, conveyance of all M.S. Tor steel and binding wires of 18· to 20 gauge as required for the work bending, binding and tying the grills in all floors (Payment will be made on weight of M.S. Tor steel only and no separate payment will be made towards the weight of binding wires) etc. including labour cess but excluding GST complete as per specification & direction of Engineer-in-Charge (First Floor)
Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment, wing wall / return walll with 100 mm dia AC pipe, extending through the full width of the structure with slope of IV:2011 towards drawing foce complete as per drawing and Technical including basic cost of all materials, labour T&P required for the work including labour cess but excluding GST complete as per direction of the Engineer-in-charge
Disposal of unserviciable debries from work site by mechanical means within 5 km lead including all labour, T&P required for the work etc. including labour cess but excluding GST complete as directed by the engineer-in-charge
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_571498.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
3DrainDefaunctNH23.pdf
Tender Documents • 0.92 MB
BOQ_571498.xls
BOQ • 1.36 MB
Download all tender documents and submit your bid