Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance | ₹5.2 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 L+₹10,950 (2.11%)Admitted-Finance | ₹5.3 L+₹10,950 (2.11%) | L2 | Admitted-Finance |
| 3 | L3₹5.3 L+₹12,240 (2.36%)Admitted-Finance HARDI BAZAR DIST KORBA CG 495446 | KORBA | CHHATTISGARH | 495446 | ₹5.3 L+₹12,240 (2.36%) | L3 | Admitted-Finance |
| 4 | L4₹6.0 L+₹79,750 (15.4%)Admitted-Finance | ₹6.0 L+₹79,750 (15.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAKESH SINGH L1 | ANUPAM ENTERPRISES L2 | Dinesh Kumar L3 | BHARTI CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.00Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | |||||||
| 1.01 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 4 | One Cubic Metre | 2,000 ₹8,000 | 2,000 ₹8,000 | 1,500 ₹6,000 Lowest | 2,000 ₹8,000 |
| 2.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 4 | One Cubic Metre | 3,000 ₹12,000 | 2,500 ₹10,000 | 1,600 ₹6,400 Lowest | 4,000 ₹16,000 |
| 3.00 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineerin-charge. | 4 | One Square Metre | 500 ₹2,000 | 900 ₹3,600 | 800 ₹3,200 | 200 ₹800 Lowest |
| 4.00 | Credit for dismantled reinforcement bars. | 250 | One Kilogram (MR) | 15 ₹-3,750 | 10 ₹-2,500 Lowest | 15 ₹-3,750 | 10 ₹-2,500 Lowest |
| 5.00Earth work in excavation by mechanical means ( Hydraulic excavator ) / manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm on plan ) including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m : | |||||||
| 5.01 | All kinds of soil. | 10 | One Cubic Metre | 160 ₹1,600 Lowest | 180 ₹1,800 | 160 ₹1,600 Lowest | 300 ₹3,000 |
| 6.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering : All work upto plinth level : | |||||||
| 6.01 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | One Cubic Metre | 6,000 ₹6,000 | 6,000 ₹6,000 | 5,000 ₹5,000 | 4,000 ₹4,000 Lowest |
| 7.00Centering and shuttering including strutting, propping etc. and removal of form work for : | |||||||
Tender Value
₹6.4 L
EMD Value
₹12,740
Closing Date
4 Jul 2026, 6:00 pmClosed
Executive Engineer (Civil)
Office of the Executive Engineer (Civil), BSNL Civil Division, BSNL Civil Division, Door Sanchar Bhawan 2nd Floor Telephone Exchange, Building Fafadih, Raipur, Pin 492009
Dismantling of damaged 40M USO Tower GBT from Bhediyanawagaon Balod transporting it to Bhilai Store dismantling the existing USO tower GBT from Armarikhurd Balod reerecting it at Bhediyanawagaon ic tower Painting Sheltar shifting
2026_BSNL_281901_1
11/2026-27/BSNL/CD/RAIPUR
Open Tender
Civil Works
Item Rate
60 days
DURG
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Accounts Officer (Cash), O/o The GMTD BSNL, Raipur
₹12,740
7 Jul 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
4 Jul 2026
24 Jun 2026
24 Jun 2026 - 4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | |||||
| 1.01 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 4 | One Cubic Metre | - | - |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 4 | One Cubic Metre | - | - |
| 3 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineerin-charge. | 4 | One Square Metre | - | - |
| 4 | Credit for dismantled reinforcement bars. | 250 | One Kilogram (MR) | - | - |
| 5Earth work in excavation by mechanical means ( Hydraulic excavator ) / manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm on plan ) including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m : | |||||
| 5.01 | All kinds of soil. | 10 | One Cubic Metre | - | - |
| 6Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering : All work upto plinth level : | |||||
| 6.01 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | One Cubic Metre | - | - |
| 7Centering and shuttering including strutting, propping etc. and removal of form work for : | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_328928.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .