Loading…
Loading…
Tender Value
₹23.3 L
EMD Value
₹46,630
Closing Date
18 Jul 2026, 10:00 am
Executive Engineer Jal Shakti Divn Haroli
Executive Engineer Jal Shakti Divn Haroli
Restoration of Rain damages to LWSS Saloh in tehsil Haroli Distt. Una (HP) (SH Construction of OHSR 50000 ltrs capacity with 15 mtrs staging height in ward No.3 ( Mohalla Mahadev)
2026_HPIPH_138268_1
No. JSV/ Haroli/ TA/ tender/26- 3298-3330 dt 06-07-26
Open Tender
Civil Works
Saloh
as per NIT
9 documents required · 9 mandatory
₹500
Yes
₹46,630
6 Jul 2026
6 Jul 2026
18 Jul 2026
7 Jul 2026
18 Jul 2026
7 Jul 2026
7 Jul 2026 - 18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc.(in pipes and pits) in all kinds of soils such as pick work, jumper work, blasting in soft/hard rock, chiselling/wedging out of rock/where blasting prohibited) saturated soil stacking the excavated soil as directed by the Engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer –in-charge in all leads and lifts. | 46.58 | Cum | - | - |
| 2 | Providing and laying cement concrete using M - 10 concrete mix with graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work foundation and plinth in all leads and lifts | 2.94 | Cum | - | - |
| 3Providing and laying cement concrete using M - 25 concrete mix with graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in : | |||||
| 3.01 | Foundation,footing.bases of columns & the like & the mass concrete. | 12.08 | Cum | - | - |
| 3.02 | Wall (any thickness,but not less than 0.10 mtr.thickness) attached pilasters,buttresses,plinth & string courses etc. from top of foundation level upto floor two level | - | - | - | - |
| 3.03 | (i) floor four level to floor five level | 16.73 | Cum | - | - |
| 3.04 | Column,pillars,posts & struts upto floor two level | - | - | - | - |
| 3.05 | Plinth Level to floor two level | 4.04 | Cum | - | - |
| 3.06 | floor two level to floor three level | 2.87 | Cum | - | - |
| 3.07 | floor four level to floor five level | 8.02 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.65 MB
Tendernotice_3.pdf
PDF • 0.15 MB
Tendernotice_4.pdf
PDF • 0.15 MB
BOQ_204777.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid