| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance GURGAON | GURUGRAM | HARYANA | 122001 | ₹1.1 Cr | L1 | Accepted-Finance Firm quoted least price. |
| 2 | L2₹1.4 CrAccepted-Finance | ₹1.4 Cr | L2 | Accepted-Finance Firm quoted price higher than L1. |
| 3 | L3₹1.7 CrAccepted-Finance | ₹1.7 Cr | L3 | Accepted-Finance Firm quoted price higher than L1. |
| 4 | L4₹1.7 CrAccepted-Finance | ₹1.7 Cr | L4 | Accepted-Finance Firm quoted price higher than L1. |
| 5 | L5₹1.7 CrAccepted-Finance | ₹1.7 Cr | L5 | Accepted-Finance Firm quoted price higher than L1. |
| Sl No | Description | Qty | Unit | Jyoti Engineering Works L2 | Globe Tech Solutions Consultancy Pvt Ltd L1 | LASHANI ENTERPRISES L5 | Evision Infratech L4 | MS RK ERACTORS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | Attending breakdown and Restoration of 220kv Orai-Parichha ckt 3and 220kv Orai-Moth D/C line (Damage of 18 No tower by replacement of 220 KV DC Tower along with foundation work & including dismantling up damage towers,shifting of material from above site to substation store within 60 KM with de-stringing ,re-stringing of ACSR Zebra Conductor, Earthwire along with all associated works. | - | - | - | - | - | - | - |
| 1.02 | Immediate diversion/Mobilization of gang for dismantling of collapsed tower with re-storation of electric supply of effected Substation 220 kV S/S moth and Parichha TPS with all T & P and man power required for completion of the work in minimum period . | 1 | Job | 50,000 ₹50,000 | 8,00,000 ₹8,00,000 | 55,000 ₹55,000 | 56,000 ₹56,000 | 45,000 ₹45,000 Lowest |
| 1.03 | Round the clock watch & ward of the line/ Line materials during line restoration work to avoid theft of conductor, Earthwire, tower part, hardware fitting, conductor / Earthwire and other accessories etc. between section tower No. 239 to tower no. 243 and 256 to 275 . | 60 | Day | 5,000 ₹3,00,000 | 2,500 ₹1,50,000 Lowest | 3,600 ₹2,16,000 | 3,650 ₹2,19,000 | 3,500 ₹2,10,000 |
| 1.04 | Arrangement of anchoring/back stay of conductor at 5 different location No. for both Ckt where ever is required with the help of 18mm wire rope to avoid tower collapse/ x-arm damage of other towers. | 5 | Job | 30,000 ₹1,50,000 | 32,000 ₹1,60,000 | 48,000 ₹2,40,000 | 4,900 ₹24,500 Lowest | 45,000 ₹2,25,000 |
| 1.05 | De-stringing of Earthwire between tower no. between section from tower No. 239 to 243 and tower no. 256 to tower no.275 including hardware fitting. | 8.38 | km | 10,000 ₹83,750 Lowest | 25,000 ₹2,09,375 | 26,500 ₹2,21,937.5 | 27,000 ₹2,26,125 | 24,000 ₹2,01,000 |
| 1.06 | De-stringing of 3 Phases ACSR Zebra conductors including insulators, hardware fitting and conductor accessories such as suspension clamp, vibration damper etc between tower No. 239 to 243 and 256 to 275 . | 16.75 | km | 45,000 ₹7,53,750 Lowest | 45,000 ₹7,53,750 Lowest | 67,000 ₹11,22,250 | 68,000 ₹11,39,000 | 65,000 ₹10,88,750 |
| 1.07 | Removal of damaged tower members of Tower no by gas cutter/removing of nut bolts to clear the site and Dismantling of 18 no. super structure of 220 KV D/C tower by opening the Nut & bolts and proper stacking at site ( Approx 80 MT Steel). | 80 | MT | 6,000 ₹4,80,000 Lowest | 8,000 ₹6,40,000 | 7,350 ₹5,88,000 | 7,450 ₹5,96,000 | 7,200 ₹5,76,000 |
| 1.08 | Making arrangement for lighting at site of work by providing generator and consumable fuel, to enable the execution of works in night hours and to safe guard from theft of conductor, Earthwire, Tower parts hardware and fittings of conductor and Earthwire etc. | 60 | Day | 6,000 ₹3,60,000 | 1,000 ₹60,000 Lowest | 8,000 ₹4,80,000 | 8,050 ₹4,83,000 | 7,000 ₹4,20,000 |
| 1.09 | Survey work for new foundation including preparation of schedule of materials, marking of location, GPS survey with co-ordinates of tower with check survey, peg marking and Pit marking. | 16 | Job | 10,000 ₹1,60,000 | 50,000 ₹8,00,000 | 37,000 ₹5,92,000 | 3,750 ₹60,000 Lowest | 35,000 ₹5,60,000 |
| 1.10 | Excavation of foundation pits including all earth work, backfilling and leveling etc for black soil and black cotton soil by the help of excavator. | 1,610.17 | Cum | 295 ₹4,75,000.15 | 198 ₹3,18,813.66 Lowest | 310 ₹4,99,152.7 | 320 ₹5,15,254.4 | 290 ₹4,66,949.3 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
11 Jun 2026, 11:00 amClosed
SE ETC Jhansi
132 KV Substation Hansari, Lalitpur Road, Jhansi - 284135
Restoration work of collapsed 16 No. DC Tower of 220KV Orai-Parichha ckt III and 220 kV Orai Moth DC Line due to heavy storm under ETD-Orai
2026_UPTCL_1157193_1
ETS-04/ETCJ/2026-27
Open Tender
Electrical Works
Fixed-rate
60 days
ETD Orai
As per PQR
2 documents required · 2 mandatory
₹1,770
SE ETC Jhansi
₹1.5 L
20 Jul 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Attending breakdown and Restoration of 220kv Orai-Parichha ckt 3and 220kv Orai-Moth D/C line (Damage of 18 No tower by replacement of 220 KV DC Tower along with foundation work & including dismantling up damage towers,shifting of material from above site to substation store within 60 KM with de-stringing ,re-stringing of ACSR Zebra Conductor, Earthwire along with all associated works. | - | - | 101 | - |
| 1.02 | Immediate diversion/Mobilization of gang for dismantling of collapsed tower with re-storation of electric supply of effected Substation 220 kV S/S moth and Parichha TPS with all T & P and man power required for completion of the work in minimum period . | 1 | Job | 101 | ₹101 |
| 1.03 | Round the clock watch & ward of the line/ Line materials during line restoration work to avoid theft of conductor, Earthwire, tower part, hardware fitting, conductor / Earthwire and other accessories etc. between section tower No. 239 to tower no. 243 and 256 to 275 . | 60 | Day | 101 | ₹6,060 |
| 1.04 | Arrangement of anchoring/back stay of conductor at 5 different location No. for both Ckt where ever is required with the help of 18mm wire rope to avoid tower collapse/ x-arm damage of other towers. | 5 | Job | 100 | ₹500 |
| 1.05 | De-stringing of Earthwire between tower no. between section from tower No. 239 to 243 and tower no. 256 to tower no.275 including hardware fitting. | 8.38 | km | 101 | ₹845.88 |
| 1.06 | De-stringing of 3 Phases ACSR Zebra conductors including insulators, hardware fitting and conductor accessories such as suspension clamp, vibration damper etc between tower No. 239 to 243 and 256 to 275 . | 16.75 | km | 102 | ₹1,708.5 |
| 1.07 | Removal of damaged tower members of Tower no by gas cutter/removing of nut bolts to clear the site and Dismantling of 18 no. super structure of 220 KV D/C tower by opening the Nut & bolts and proper stacking at site ( Approx 80 MT Steel). | 80 | MT | 103 | ₹8,240 |
| 1.08 | Making arrangement for lighting at site of work by providing generator and consumable fuel, to enable the execution of works in night hours and to safe guard from theft of conductor, Earthwire, Tower parts hardware and fittings of conductor and Earthwire etc. | 60 | Day | 104 | ₹6,240 |
| 1.09 | Survey work for new foundation including preparation of schedule of materials, marking of location, GPS survey with co-ordinates of tower with check survey, peg marking and Pit marking. | 16 | Job | 105 | ₹1,680 |
| 1.1 | Excavation of foundation pits including all earth work, backfilling and leveling etc for black soil and black cotton soil by the help of excavator. | 1,610.17 | Cum | 106 | ₹1,70,678.02 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
SBD.pdf
Tender Documents • 0.98 MB
BOQ_2168394.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].