Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-AOC 20 GANDHI NAGAR EXTENSION WIMCO NAGAR THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | CHENNAI | TAMIL NADU | 600019 | 1 | Accepted-AOC L1 | |
| 2 | 2₹4.6 L+₹39,174.40 (9.31%)Rejected-AOC | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MARAN BROTHERS L2 | JAI POWERS L1 |
|---|---|---|---|---|---|
| 1.00 | charges for leading, lifting and transportation of iron and steel materials from store to site. ( Elevation -> 09 to 20 Mtr ) SCAPH A & B pass valves station @ 14.5mtr elevation. | 1.6 | MT | 7,000 ₹11,200 | 6,613 ₹10,580.8 Lowest |
| 2.00 | charges for fabrication and erection of MS structurals and patch up work ( Elevation -> 09 to 20 Mtr ) SCAPH A & B pass valves station @ 14.5mtr elevation | 1.6 | MT | 63,000 ₹1,00,800 | 59,928 ₹95,884.8 Lowest |
| 3.00 | Supply of Roof sheet :
0.5mm TCT color bond trapezodial TRIMDEK profile roof sheet RMP 15-20 microns on top and 5 - 7 microns back coat grey color on bottom side in Sq. mtr | 185 | Sq.mtr | 1,100 ₹2,03,500 | 1,016 ₹1,87,960 Lowest |
| 4.00 | charges for erection of TCT color bond trimmed profile cladding sheets / other types of cladding sheet including consumables & T&Ps for SCAPH A & B pass valves station @ 14.5mtr elevation | 185 | Sq.mtr | 700 ₹1,29,500 | 610 ₹1,12,850 Lowest |
| 5.00 | charges for cleaning & painting new erected structures in SCAPH A & B pass valves station @ 14.5mtr elevation. Each one coat of red oxide zinc chromate primer and two coat of smoke grey enamel paint including cost of paint, labour consumable, & T&Ps | 50 | Sq.mtr | 300 ₹15,000 | 271 ₹13,550 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
16 Aug 2024, 2:00 pmClosed
SE MI NCTPS II
O o Superintending Engineer M I NCTPS II CHENNAI 120
NCTPS II MI Circle BM Division Unit I Boiler 600 MW Providing roof to cover
2024_EB_468659_1
SE MI NCTPS II O M 17 24 25
Open Tender
Miscellaneous Works
Works
30 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,700
Yes
30 Aug 2025
1 Aug 2024
17 Aug 2024
1 Aug 2024
16 Aug 2024
1 Aug 2024
Amount
charges for leading, lifting and transportation of iron and steel materials from store to site. ( Elevation -> 09 to 20 Mtr ) SCAPH A & B pass valves station @ 14.5mtr elevation.
charges for fabrication and erection of MS structurals and patch up work ( Elevation -> 09 to 20 Mtr ) SCAPH A & B pass valves station @ 14.5mtr elevation
Supply of Roof sheet : 0.5mm TCT color bond trapezodial TRIMDEK profile roof sheet RMP 15-20 microns on top and 5 - 7 microns back coat grey color on bottom side in Sq. mtr
charges for erection of TCT color bond trimmed profile cladding sheets / other types of cladding sheet including consumables & T&Ps for SCAPH A & B pass valves station @ 14.5mtr elevation
charges for cleaning & painting new erected structures in SCAPH A & B pass valves station @ 14.5mtr elevation. Each one coat of red oxide zinc chromate primer and two coat of smoke grey enamel paint including cost of paint, labour consumable, & T&Ps
MARAN BROTHERS (BID ID -1109376)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .