Loading…
Loading…
Tender ID
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹3.9 LAWARDED | AWARDED |
Tender Value
₹4.6 L
EMD Value
₹4,897
Closing Date
21 Aug 2025, 9:30 pmClosed
Directorate of Municipal Administration
Continue construction of Garadi mane at Tadasinakoppa in w.no. 25
DMA/2025-26/OW/WORK_INDENT45839
DMA/2025-26/OW/WORK_INDENT45839
Reserved
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
₹500
₹4,897
2 Aug 2025
2 Aug 2025
16 Aug 2025
Continue construction of Garadi mane at Tadasinakoppa in w.no. 25
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing1,and technical specifications, including setting out,Ishoring, strutting, barricading, caution l...
Providing and laying in position plain cement concrete for levelling course for all works in foundation.The granite, trap, basalt crushed graded coarse aggregates and fine aggregates as per relevant I...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Providing and laying in position ReinforcedCement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) inc...
Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mor...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Footing (All other types) 3% Percentage on finished rate of concrete per m3 SR 2023-24 P.No.111(Volume-1)(SL No...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Columns 70% Percentage on finished rate of concrete per m3 SR 2023-24 P.No.111(Volume-1)(SL No-9)
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Plinth Beam 50% Percentage on finished rate of concrete per m3 SR 2023-24 P.No.111(Volume-1)(SL No-2)
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Lintel + beam (RCC Beams, Lintels & Troughs of Aqueducts) 60% Percentage on finished rate of concrete per m3 SR...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Slab 50% Percentage on finished rate of concrete per m3 SR 2023-24 P.No.111(Volume-1)(SL No-15)
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .