Separating the abc cable size 3x150 in the area of 33 11 KV Electricity Substation No 5 from Bharat Gas Godown to New Quila Road
2021_PVVNL_602829_1
28/2021-22
Open Tender
Electrical Works
Item Rate
As Per Tender Docoment
Separating the abc cable size 3x150 in the area of 33 11 KV Electricity Substation No 5 from Bharat Gas Godown to New Quila Road
3 documents required · 3 mandatory
₹1,180
Superintending Engineer EDC I Bulandshahr
₹2,000
Yes
22 Jul 2021
12 Jul 2021
19 Jul 2021
12 Jul 2021
19 Jul 2021
12 Jul 2021
Amount
fo|qr forj.k [k.M&[kqtkZ] ds vUrZxr 33@11 ds0oh0 fo|qr midsUnz ua0&5] [kqtkZ ds dk;Z{ks= esa Hkkjr xSl xksne ls U;w fdyk jksM+] tsoj jksM+ rd 585 eh0 ,0ch0lh vkdkj 3x150 esa ckj&ckj vkx yxus ds dkj.k {kfrxzLr gksus ds n`f"Vxr dsfcy dks mrkj dj vyx&vyx djrs gq,s DySEi ,oa bU’kwysVj bR;kfn yxkrs gq,s iqu% LFkkfir djus@yxkus lEcU/kh dk;ZA
Dismantling of ABC Cable size 3x 150 in the area of 33/11 KV Electricity Substation No.-5, Khurja from Bharat Gas Godown to New Quila Road, Jewar Road in view of the damage caused due to frequent fire.
Separation work of ABC cable size 3x 150 cable from Bharat Gas Godown to New Quila Road, Jewar Road under the jurisdiction of 33/11 KV Power Substation No.5, Khurja.
Re-installation of ABC cable size 3X150 by installing clamps and insulators etc. from Bharat Gas Godown to New Kila Road, Jewar Road in the jurisdiction of 33/11 KV Electricity Substation No.-5, Khurja.
Providing & Cutting /drilling /Welding of MS Angle iron for making guarding angle size 65x65x6/50x50x6 mm including the work of fixing the bracket on PCC/ST pole for construction of the line.
Laying, sagging. Stringing and binding and jumpering of ACSR Weisal , rabbit, dog newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
LT ABC Cable 3x150 Square MM
Fixing of t off Chneel
Tightening of Stay
Change of broken/Damaged/Missing following Items :-
Fixing of Pin Insulator
Fixing of Disc Insulator
Ailment of PCC/STP Pole
Bolt & nut off size.
The folloing material is required to be supplied by the contractor.
Side bracket
Holding clamp.
Bolt & nut off size.
M/S TUSHAR CONSTRUCTION
Vivek Electricals
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .